Applications tied to the site
Partial coverage13 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
13 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 1,356 decisions within 5 km, 13 exact-site or onsite candidate records, and 109 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
13 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
13 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
109 structured nearby appeal records.
109 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The development will consist of: clearance works on a 0.3217 ha site and the construction of a 7 storey hotel (GFA 8,221 sq.m) comprising 99 no. ensuite bedrooms, ground floor restaurant and bar, hotel foyer and reception, gym, 1st floor function room, meeting rooms, 1st floor outdoor terrace, 5th floor bar/restaurant with outdoor terraces and balcony and 6th floor outdoor swimming pool area and bar/restaurant with outdoor terrace. A public plaza area is also proposed along the west of the site. A vehicle set down area is proposed along Dublin Road. The proposal includes green roofs, 18 no. bicycle parking spaces, ESB substation, landscaping and drainage works. Works to demolish a limestone wall which is part of the Protected Structure of MacDonagh Station (Ref. D86) and its reuse within the site is also proposed
For development at this site. The development will consist of: Temporary retention of a surface carpark (previously permitted Planning Ref No. 08/56 & 11990058) at a previously permitted mixed-use scheme (the 'parent permission' Kilkenny Borough Council Reg.Ref. 03/32: An Bord Pleanala Reg. Ref. PL62.207285). The temporary surface carpark is on the site of the permitted hotel (Building No.6) of approximately 0.1505 ha. forming part of the MacDonagh Junction and adjoining lands of 4.94 ha approximately, Kilkenny. The development for which temporary retention permission is sought consists of: the provision of 45 No. surface car spaces (including 2 No. disabled spaces); a turning area; drainage, lighting, flagpoles, bollards, pay and display machine; and all associated site development works. The temporary car park will revert to its permitted hotel use under Reg. Ref. 03/32 (or an amendment to that permission) once construction of that development commences.
For a 8 meters by 12 meters, outdoor fenced area to house a Wellness and Sauna Facility and all associated site work's. The proposed development is located within the curtilage and adjacent to 2 no. protected structures namely D86 (NIAH ref. 12000190) Railway Station, including goods shed and footbridge and B38 (NIAH ref.12006001) Former Workhouse, remains of a Union Workhouse complex built in 1840. The proposed works relate to an outdoor fenced area housing a Sauna Facility only and no works are proposed to the elevations or to the structures of the protected buildings and no ground excavations are required
For development at this site Jim Burkes Bar and Guesthouse, which is a protected structure (RPS Ref No: PB109). The development will consist of permission for the construction of a first-floor level seating area enclosed in glazing, modification to existing boundary wall and gate/access on the Dublin Road and all associated siteworks
For the modification of the approved plan, Ref: P19-562, granted for the construction of a link ramp between the Goods Shed courtyard of MacDonagh Junction Shopping Centre and the MacDonagh Junction Train Station path. The proposed modifications include the provision of an external stairway access attached to the link ramp structure and including all associated works. The proposed works are located within the environs of 2 no. Protected Structures - The Goods Shed, NIAH Ref. 12000193 and the Railway Station Complex, NIAH Ref. 12000190. The proposed works relate to the ramp and stair construction only and no works are proposed to the elevations or to the structure of the protected buildings and no ground excavations are required
For the construction of a link ramp between the Goods Shed court yard of MacDonagh Junction Shopping Centre and the MacDonagh Junction Train Station path, including all associated works. The proposed works are located within the environs of 2 no. Protected Structures - The Goods Shed, NIAH Ref. 12000193 & The Railway Station complex, NIAH Ref. 12000190. The proposed works relate to the ramp construction only and no works are proposed to the elevations or to the structure of the protected building
The brief summarizes the pattern across all 1,356 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2360079The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief