Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
18% of nearby decided applications were refused. The site check found 438 decisions within 5 km, 2 exact-site or onsite candidate records, and 52 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
1 prompt is backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 matched52 structured nearby appeal records.
52 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of a new dwelling ( consisting of a revised house type, adjustment to house location from that as granted under PRR 19/527), domestic garage, wastewater treatment unit and polishing filter, new well and associate works
Dwelling, garage and effluent treatment system, all together with associated site works
Additions, alterations and demolitions to existing derelict farm outbuildings to create 7 cottages complete with all associated works, services, site works and wastewater treatment system
The construction of an agricultural building (44m2) for use as a learning space, ancillary to the existing agricultural programmes provided on site, together with planning permission for the upgrade of existing effluent treatment system, all together with associated site works
Construction of a half-bellmouth entrance, construction of a forest road and ancillary works. The proposed entrance and forest road will connect the public road to an existing forestry plantation, to facilitate occasional access to the forest for felling & thinning operations.
Dwelling, garage, bored well, wastewater treatment system to current EPA standards and all associated ancillary site works and services
The brief summarizes the pattern across all 438 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2360281The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief