Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 1,365 decisions within 5 km, 2 exact-site or onsite candidate records, and 109 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
109 structured nearby appeal records.
109 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For modifications to the apartment building located in the eastern section of the site only and will consist of: A) The reduction in the permitted height of the approved apartment building from 4 storeys to 3 storeys resulting in an overall decrease of 6 no. units (from 32 no. to 26 no. in the apartment building) and consequent reduction in units across the site from 183 to 177 no. units; B) Minor amendment to the building footprint of the approved apartment building to accommodate the provision of new apartment types at ground, first and second floor levels; C) Amendments to the fenestration arrangements on all elevations of the permitted apartment building to accommodate new apartment types, provision of balconies and amendments to finish to elevations; D) Amendments to ancillary apartment areas (plant/meter room and plant/sprinkler tank areas at ground floor level of the apartment building). The overall permitted layout including road layout and services will remain as per the parent permission approved by An Bord Pleanála under the Strategic Housing Development process
For the construction of a two-storey, sixteen classroom primary school building and a two classroom special needs centre with a combined floor area of 2741m2, together with outdoor play facilities, a new entrance from College Avenue, set down area and parking facilities and all associated site development, infrastructural and landscaping works
For change of use from Shop to Creche facilities to property located at
For works to existing single storey dwelling consisting of demolition of existing side extension, construction of new extensions along with all associated elevational amendments, internal reconfigurations, new service connections and all site and ancillary works
For the erection of a dwelling house, domestic garage/store, installation of a treatment system and percolation area and all associated site works
Extension to existing dwelling, including all associated site works
The brief summarizes the pattern across all 1,365 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2360580The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief