Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 1,606 decisions within 5 km, 6 exact-site or onsite candidate records, and 101 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matched1 of 2 layers are loaded for Waterford City and County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Waterford City and County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Waterford City and County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
101 structured nearby appeal records.
101 matchedNo current-dated citation is loaded for Waterford City and County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
A) Internal alterations at first floor level of Building A to form additional floor space (616m2) including installation of associated rooflights & external windows; b) construction of a new entrance lobby (5.90m2) and first floor link corridor to Building A (112m2); c) internal alterations to Building A to accommodate improved stair and lift access; d) together with associated site works including installation of 6 No. material feed silos
A) Internal alterations at first floor level of Building B to form additional floor space (319m2) including installation of associated rooflights; b)Alterations to existing East (Rear) Elevation at second floor level of Building B incorporating installation of windows in existing external wall to existing storage/office space; c) Erection of an external walkway (24m2) at second floor level to link Building B & C together with installation of external door to access same from Building B; all together with associated works
A single storey Plant Room extension to the rear [east ] of the existing building inclusive of all associated ancillary works and associated site works at
For Construction of a 1MW/1.1MWh Stationary Battery Energy Storage facility, which includes 1no. 20ft container, 1no. medium voltage transformer and 1no. low voltage enclosure,All associated site and development works
For the demolition of an existing carpentry training facility, and for the construction of a new two-story replacement training facility building, comprising of a carpentry training workshop and classroom together with all associated site development works at
To extend the front of the garage and also to extend the entrance porch
The brief summarizes the pattern across all 1,606 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2360601The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief