Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 254 decisions within 5 km, 5 exact-site or onsite candidate records, and 14 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
14 structured nearby appeal records.
14 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A) proposed new astro-turf training pitch complete with perimeter fencing and ball stop netting, b) proposed new 6m high hurling/football ball wall, c) proposed new floodlighting installation to new astro-turf and existing grass pitch to include new lighting poles, d) all associated site works
Construction of a free-standing, single-storey, prefabricated, two classroom ASD unit with associated ancillary spaces and covered walkway to the rear (south west) of existing building and associated site drainage and site development works
The construction of all-weather sports facilities to the rear of the school including the following: a) a 3 lane, 400-metre athletic running track, with a 6 lane, 100-metre sprint track, b) an all-weather pitch for soccer and GAA games, c) track and field sports including long jump, high jump, shot put, boules, miniature-golf course, d) a perimeter walkway/running track with low level lighting around the existing amenities, e) flood-lighting to the main all-weather pitch and track and field sports, f) two new paddle courts with flood lighting and associated fencing, g) proposed ball stop netting, h) proposed dugouts, i) ancillary structures such as a small retaining wall between the all-weather pitch and the existing grass pitch, steps, footpaths, fencing and gates. The works include all landscaping, drainage, ancillary works and services
A) the construction of four new extensions with a total combined floor area of 2,522.50m², comprising - (i) extension 1 (2,367m²), a part single storey and part two storey extension to the west of the existing school building. Extension 1 comprises a 4 no. classroom SEN base, 6 no. general classrooms, 4 no. specialist classrooms, 3 no. SET rooms, as well as storage, toilets, locker/social spaces, and other ancillary accommodation. Extension 1 is connected to the existing school by two short link corridors. Extension 1 includes solar PV panels on the roof; (ii) extension 2 (58.5m²) and extension 3 (58.5m²), both single storey extensions located within a service yard to the east of the existing school building. Extensions 2 and 3 are both technology preparation rooms and are attached directly to existing technology classrooms, and; (iii) extension 4 (38.5m²), a single storey external store extension; b) demolition of part of the existing service yard, including four small stores (total area 67.4m²); c) construction of a new 2.1m high rendered wall and vehicular gates to the modified service yard, and construction of a new covered storage area; d) modifications and extension to the existing car park to provide additional car parking spaces and an SEN set down area; e) two new covered bicycle shelters and relocation of the two existing covered bicycle shelters; f) provision of a new heat pump compound enclosed in 2.1m high palisade fencing; g) construction of an SEN enclosed play area and a sensory garden; h) all ancillary site development works, including new hard and soft landscaping, an underground firefighting static storage tank, a swale and a soakaway, and i) all associated site services, including external lighting and EV charging
The installation of 40 kW (201 m2) of photo-voltaic panels on the roof of an existing building
(i) domestic garage/store (ii) hipped roof to rear extension of dwelling and (iii) existing boundary walls
The brief summarizes the pattern across all 254 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2360696The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief