Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 148 decisions within 5 km, 1 exact-site or onsite candidate record, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Tipperary County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Tipperary County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Tipperary County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedNo current-dated citation is loaded for Tipperary County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
(i) change the use of an existing dwelling to a home office, home gym & store, (ii) construct a new dwelling, (iii) construct an entrance & to (iv) construct a waste water treatment system and all associated site development works
(i) Cubicle shed with underground effluent tank (ii) Walled Silage slab (iii) extension to underground effluent tank and all associated site works
The construction of a cubicle house, associated concrete yards and site works. RETENTION PERMISSION for an associated underground slatted slurry storage tank
Construction of Pig Fattening House, Feed Kitchen, Feed Bins, Geomembrane Lined Manure Storage Basin, Water Tanks, Roof Mounted Solar Panels
Dwelling, garage, effluent treatment system, entrance and all associated site works
1) a dormer type extension to existing dwelling house, 2) part demolition of the existing house and the refurbishment of the remaining dwelling including revised fenestration, 3) domestic garage, 4) new wastewater system to replace existing septic tank, 5) upgrading of existing vehicular entrance, 6) RETENTION of a mobile home and completed site works (stone infill area) for the duration of the build and all proposed associated site works
The brief summarizes the pattern across all 148 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2360811The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief