Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
19% of nearby decided applications were refused. The site check found 113 decisions within 5 km, 3 exact-site or onsite candidate records, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To include development of a 240MWh battery energy storage systems facility within a total site area of up to 3.02 hectares, the site will include 1no. 38KV substation compound including 1no. single storey electrical substation building with an area of 69m2 & associated switchgear, 12no. electrical inverters & 6no. electrical transformer, 31no. containerised battery storage modules on concrete plinths, access tracks & new site entrance, associated electrical cabling & ducting, security gates, perimeter security fencing, CCTV security monitoring & lighting system, landscaping works & all associated ancillary infrastructure
For: a) the demolition of an existing dwelling house and b) the construction of a new dwelling house, domestic garage, septic tank/treatment unit with percolation area and all associated site works. Gross floor space of proposed works: 288 sqm. Gross floor space of any demolition: 45 sqm
To erect a dwelling house, garage and effluent treatment unit coupled with ancillary site works. Gross floor space of proposed works: 171.26 sqm
To erect a dwelling house, garage and effluent treatment unit coupled with ancillary site works. Gross floor space of proposed works: 172.26 sqm
To construct a new dwelling, domestic garage, septic tank, treatment system and percolation area and all associated works. Gross floor space of proposed works: House: 186 sqm, Garage: 34 sqm
To construct a new dwelling house, domestic garage, septic tank/treatment unit with percolation area and all associated site works. Gross floor space of proposed works: House - 234.4 sqm, Garage - 72 sqm
The brief summarizes the pattern across all 113 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2360827The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief