Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 234 decisions within 5 km, 1 exact-site or onsite candidate record, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of a dwelling house, waste water treatment system and percolation area, entrance, garage and all ancillary site works
Alterations to single storey extension granted under previous planning reference 22/985, to provide an alternate floor plan, new elevation and altering the roof from pitched slate to a flat aluclad zing style, with extended cantilevered canopy over the front door along with all necessary ancillary site development works
Construction of a single-storey extension to existing kitchen, retention of single-storey sunroom to front elevation, retention of detached domestic garage to rear of the site, retention of minor changes to elevations, along with all necessary ancillary site development works
The construction of a slatted agricultural shed, holding area, cattle crush and all ancillary site works
Extension of duration for 11/1066 for construction of a digester plant, associated ABP building and associated site works to process farm slurry and other organic material to provide renewable energy and fertilizer
A new dwelling, wastewater treatment system, entrance & associated site works
The brief summarizes the pattern across all 234 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2360906The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief