Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
0% of nearby decided applications were refused. The site check found 80 decisions within 5 km, 1 exact-site or onsite candidate record, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of an 1,800 sq.m sludge holding building of c. 60m in length, 30m in width and 13.5m in height, to incorporate an open faced biofilter to be installed at the western end of the facility building, for the acceptance and temporary storage of up to 12,000 tonnes per annum of sludges produced from wastewater treatment; internal site roads and parking; a 50 sq.m welfare/office facility of c. 10m in length, 5m in width and 5m in height; 1 no. surface mounted weighbridge; an electrical sub-station of c. 7.5m in length, 4.3 m in width and 3.2 m in height; underground holding tanks, infiltration areas and associated drainage pipework; pumphouse of c. 2.5m in width, 2.5 m in length and 2.8m in height; permeable and impermeable hardstanding; entrance gate and fencing and perimeter landscaping. An Environmental Impact Assessment Report has been submitted as a part of this application
The acceptance and processing of organic waste materials at the existing Anaerobic Digestion Facility of up to 30,000 tonnes per annum; glass lined steel digestate storage tank of 46.1m in diameter and 5.67m in height; an office building of 5.83m in height, 7.6m in width and 15m in length; and all associated site development works, ancillary works and equipment. The planning application is accompanied by an Environmental lmpact Assessment Report (EIAR)
Existing onsite weighbridge; the existing office portacabin structure of 9m in length, 3m in width and 2.6m in height until end of 2022; the existing control room of 4.31m in height, 5.1m in width and 5.06m in length; the biofilter unit and associated pipework installed in its existing orientation; the existing pump house of 2.4m in height, 2.5m in length and 1.7m in width; the plant room of 4.82m in height, 7.66m in width and 7.9m in length; and associated ancillary infrastructure including an underground holding tank of 45m3 capacity; tank bund area of 10.5m in length and 3m in width and 668 sq.m area of hardstanding with provision for 7 no. car parking spaces
A 10-year planning permission for development of a BioProducts Campus. The Bioproducts Campus development consists of an integrated Compost / Growing Media Facility and Anaerobic Digestion Facility as well as a Biorefinery. The Compost / Growing Media Facility comprises 1 No. composting building (incorporating feedstock intake area, storage area, in-vessel tunnels, workshop), solar panels at roof level, associated biofilter and liquid storage tanks, 1 No. maturation building and 1 No. office building. The Anaerobic Digestion Facility comprises 3 No. digester tanks, 2 No. digestate storage tanks, 2 No. biogas fuelled electricity generating gas engines, 3 No. biogas processing units, associated storage tanks, bunding, plant and 1 No. gas flare. The BioRefinery includes 1 No. building (incorporating a goods inward area, processing area, drying room, process control rooms, a laboratory and offices), associated feedstock storage tanks; a BioEnergy Facility comprising 1 No. biomass boiler building, associated water storage tank, 1 No. materials storage building. The integrated Compost / Growing Media Facility and Anaerobic Digestion Facility will accept up to 80,000 tonnes of waste materials per annum. Provision of new site access from the R502, internal access roads and hardstanding, car parking, fire water tank and retention pond, ESB substation and pump house, 4 No. weighbridges, entrance gate and security fence. The proposed development includes all ancillary site development, landscaping and boundary treatment works above and below ground. The application relates to development which comprises or is for the purposes of an activity requiring an Industrial Emissions Licence. An Environment Impact Assessment Report will be submitted with this application.
A state-of-the-art healthcare waste treatment and recycling facility and a waste transfer station. The development will include the construction of 3 no. buildings; Building 1 (total gross floor area of circa (ca.) 2,242m2 and ca. 9m tall), Building 2 (total gross floor area of ca. 229m2 and ca. 6m tall) and Building 3 (total gross floor area of ca. 68m2 and ca. 4m tall) along with associated ancillary development including rooftop solar photovoltaic panels, 1no. battery energy storage system (total gross floor area of ca. 34m2 x 2m tall) and inverter, onsite tank with bunding, vehicle parking, rainwater harvesting tank, surface water retention ponds, firewater retention pond, firewater storage pillow tank, an on-site wastewater treatment system and associated polishing filter bed percolation area, dedicated container storage yard for the temporary storage of container units, signage, landscaping, perimeter security fencing and all ancillary works. The total development area will be ca. 3.75 hectares(ha). The development will intake ca. 10,000 tonnes per annum of healthcare waste for treatment and recycling and an additional ca. 15,000 tonnes per annum of hazardous waste will be accepted, temporarily stored, handled and consolidated onsite for onward transfer - an EIAR has been submitted with the application
Works within the boundary of the existing Lisheen 110 kV Substation, the proposed works will comprise: replacement and improvement works to an existing electrical transformer bund; construction of two new concrete plinths for associated electrical infrastructure; installation of electrical infrastructure; and underground cable connection from the electrical infrastructure to the existing substation control building. The application is accompanied by a Planning and Environmental Report and Appropriate Assessment Screening Report
The brief summarizes the pattern across all 80 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2361035The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief