Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 111 decisions within 5 km, 1 exact-site or onsite candidate record, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Tipperary County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Tipperary County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Tipperary County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedNo current-dated citation is loaded for Tipperary County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
A) the rebuilding of habitable dwelling with elevational changes, (b) the construction of a further single storey extension to aforementioned dwelling. Permission for decommissioning of exiting septic tank, installation of new treatment tank and percolation area, upgrading of vehicular entrance and all associated site works
A conversion of existing outbuilding to living accommodation and a single storey side extension to existing dwelling to form link from existing dwelling to converted outbuilding.
Existing domestic camper van and car storage garage and for retention of planning permission for timber storage shed and private work area
A) Demolition of an existing derelict dwelling house b) Alterations to existing cubicle house and the construction of an extension consisting of cubicles, livestock feeding area and straw bedding c) Construction of a milking parlour, dairy and ancillary rooms, livestock waiting yard, livestock handling facilities, underground slatted flow channel and underground slatted soiled water tank d) erection of a meal bin e) Construction of an agricultural building consisting of livestock cubicles and an underground slatted flow channel f) Change of use of existing milking parlour to livestock cubicle house g) Alterations to existing milking parlour and cubicle house building h) Construction of an extension to existing over ground slurry store i) Construction of a roof over existing over ground slurry store and all associated site works
Construction of a two-storey extension to the side of the existing dwelling and associated site works
The erection of a domestic storage shed with solar panels on the roof and all associated site development works
The brief summarizes the pattern across all 111 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 24194The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief