Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 356 decisions within 5 km, 4 exact-site or onsite candidate records, and 11 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
11 structured nearby appeal records.
11 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Retention of original dwelling house built under Planning Permission ref. no. PL9968, and to retain entrance gate as constructed previously granted under Planning Permission PL07/273, retain balcony & minor alterations on western elevation (change of windows to patio doors (all other relevant works carried out on this site are covered by the following Planning Permissions PL06/353, & PL07/794)
CONSTRUCT PROPRIETARY EFFLUENT TREATMENT AND PERCOLATION AREA INCLUDING ALL ANCILLARY SITE WORKS
(1) construction of a new detached dwelling house, (2) proposed effluent treatment system, percolation area and all associated site works A Natura Impact Statement has been prepared in respect of this application.
Retain dwelling house and domestic shed and upgrade septic tank to proprietary effluent treatment system and all ancillary site works
PP - development consisting of retention of existing dwelling house and upgrade the existing septic tank system to include a new septic tank, proprietary effluent treatment unit and percolation area including all ancillary site works, (2) permission for retention three domestic sheds
Permission and Permission for Retention for the following: a) Retention of slatted slurry storage tank. b) Partial demolition of existing silage pit. c) Construction of an agricultural building to include a milking parlour, dairy and ancillary room. d) Construction of a drafting area with handling facilities and livestock waiting yard. e) Construction of an underground slatted storage tank. f) Erection of a meal bin, external water storage tank and all associated site works At Killanly and Rinroe, Co. Sligo. Please Note: This proposed development is within the curtilage of a protected structure.
The brief summarizes the pattern across all 356 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2443The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief