Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
0% of nearby decided applications were refused. The site check found 42 decisions within 5 km, 4 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched1 of 2 layers are loaded for Sligo County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Sligo County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Sligo County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
No current-dated citation is loaded for Sligo County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
(1) demolition of existing changing rooms (2) construction of a new two storey clubhouse consisting of 4 number changing rooms, general-purpose room, kitchen, toilets and ancillary accommodation (3) proposed new waste water treatment system and percolation area (4) and all associated site works
Development consisting of (a) 6m high public lighting fixtures at 30m spacing or thereabouts to the perimeter path at GAA pitch. (b) 2 No. 12-15 m high sportslighting fixtures at the training pitch together with all associated site works.
(1) construction of a new astro pitch with associated floodlighting and fencing (2) construction of a new clubhouse consisting of 4 number changing rooms, general-purpose room, kitchen, toilets and ancillary accommodation which will be partially incorporated within and also include extensions and alterations to the existing covered multi-purpose area (3) proposed new waste water treatment system and percolation area (4) and all associated site works
Development consisting of construction of spectator stand (area 180sqm approx.) serving existing concrete terrace area together with all associated site works
For development consisting of alterations and extension to existing facility, including the construction of loading docks together with all ancillary site works and services
Development consisting of construction of hipped roof to replace a flat roof on existing dwelling and to remove an existing chimney from the dwelling along with upgrade to existing effluent treatment system
The brief summarizes the pattern across all 42 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2460067The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief