Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 249 decisions within 5 km, 2 exact-site or onsite candidate records, and 7 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
7 structured nearby appeal records.
7 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
FOR THE CONSTRUCTION OF 20 No. HOUSES AS FOLLOWS: 8 No. FOUR BEDROOM TWO STOREY SEMI-DETACHED HOUSES IN 4 BLOCKS OF SEMI-DETACHED HOUSES,12 No. THREE BED TWO STOREY SEMI-DETACHED HOUSES IN 6 BLOCKS OF 2 HOUSES OF SEMI-DEATCHED HOUSES, PLANNING PERMISSION FOR THE CONSTRUCTION OF 8 NO SELF SERVICED SITES FOR THE PROVISION OF ONE HOUSE ON EACH SITE, CONNECTION TO PUBLIC FOUL SEWER, CONNECTION TO PUBLIC WATER, SURFACE WATER ATTENUTATION WORKS, LANDSCAPING WORKS, BOUNDARY TREATMENTS, RECESSED ENTRANCE AND ALL ASSOCIATED SITE WORKS.
To construct a two storey extension to existing house, also permission to retain mobile home (during construction phase), and all associated site works
To construct a new, two-storey, end terrace dwelling, including retention of mobile home (during construction phase), and all associated site works attached to 20 Greenview. To be called 20A Greenview,
For development. The development will consist of a multi-purpose play area, including the following: Children's play zones, multi-sport ball court enclosure, perimeter walking track, access road to adjoining soccer club lands, carparking, landscaping (including footpaths), boundary and ballcourt fencing, and all associated site works
FOR THE CONSTRUCTION OF 44 No. HOUSES AS FOLLOWS: 18 No. THREE BED TWO STOREY TERRACED HOUSES IN 3 BLOCKS OF 6 HOUSES, 16 No. THREE BED TWO STOREY TERRACED HOUSES IN 4 BLOCKS OF 4 HOUSES, 2 No. THREE BED TWO STOREY SEMI DETACED HOUSES, 4 No. SEMI-DETACHED SINGLE STOREY TWO BED HOUSES IN 2 BLOCKS OF 2 HOUSES 4 No. FOUR BEDROOM, TWO STOREY DETACHED HOUSES. CONNECTION TO PUBLIC FOUL SEWER, CONNECTION TO PUBLIC WATER, SURFACE WATER ATTENUTATION WORKS, LANDSCAPING WORKS, BOUNDARY TREATMENTS, RECESSED ENTRANCE AND ALL ASSOCIATED SITE WORKS
Permission to retain the 0.73 m2 ground floor extension, 22.34 m2 first floor extension and 21.61 m2 services platform at the second floor level, and a permission to redesign the front elevation and all associated site works
The brief summarizes the pattern across all 249 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2460239The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief