Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 97 decisions within 5 km, 3 exact-site or onsite candidate records, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Conversion of the attic from storage to habitable living accommodation ancillary to the existing dwelling, including 2no. new dormer windows to the southeast, 1no. dormer window to the south west, 1no. dormer window to the north west at first floor and remove 1no. roof lights from the rear of the house and all associated site works
THE EXTRACTION OF MATERIAL OVER AN AREA OF 0.95 HECTARES AND PLANNING PERMISSION FOR THE RESTORATION TO AGRICULTURAL USE OF THE SAME 0.95 HECTARE AREA
The backfilling of a permitted sand and gravel pit (QY75) with Article 27 by product soil and stone; all associated ancillary facilities, including, wheelwash, small portacabin office/canteen and chemical toilet all within an application area of c.3.2 Ha. The applicant is seeking a 10-year permission for infilling and associated activities, with an additional 2 years for final site restoration.
CONSTRUCTION OF A DWELLING HOUSE, NEW SITE ENTRANCE, EFFLUENT TREATMENT SYSTEM AND PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF A DWELLING HOUSE, NEW SITE ENTRANCE, EFFLUENT TREATMENT SYSTEM AND PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS
DWELLING HOUSE, DOMESTIC GARAGE, NEW SITE ENTRANCE, EFFLUENT TREATMENT AND PERCOLATION AREA AND ALL ASSOCIATED ANCILLARY WORKS
The brief summarizes the pattern across all 97 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2460359The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief