14% of nearby decided applications were refused. The site check found 669 decisions within 5 km, 1 exact-site or onsite candidate record, and 45 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
45 structured nearby appeal records.
45 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of a new Warehouse / Garage Unit and associated office space (1,054 sqm total) for the servicing / maintenance of vehicles, primarily trucks and vans. The proposed development will include all earthworks, drainage infrastructure and attenuation, landscaping, security fencing / boundary treatment, car parking spaces, truck parking spaces, bicycle parking spaces, and all other associated site development works above and below ground level. The proposed development will include all associated site development works with connections to existing services previously permitted and constructed
Erection of one internally illuminated wall sign and two non-illuminated wall signs to replace existing
Development will principally consist of the reversion of the premises (2,116 sq m) from its current use as a distribution hub to the previously permitted use as a builders’ merchants; removal of the existing mezzanine (182 sq m), and provision of two new mezzanine areas (670 sq m and 133 sq m); internal modifications; elevational changes including the provision of a roller shutter door on the east elevation and 3 No. fire escape doors on the east, west and south elevations; a canopy structure attached to the south elevation; new signage including elevational signage and an illuminated freestanding sign (3 m in height); provision of a security hut (5.3 sq m); the omission of 1 No. car parking space to facilitate cycle parking; the minor repositioning of car parking spaces; HGV loading bays; external storage; hard and soft landscaping; and all associated site and development works above and below ground. The gross floor area of the building will increase from 2,116 sq m to 2,737 sq m, and the maximum building height of 10.265 m will remain unchanged
The development will consist of the installation of 2 No. HVO fuel above ground storage tanks (a 80,000 litre and a 50,000 litre tank), the relocation of an existing 12,000 litre HVO fuel above ground storage tank and an existing 1,000 litre Ad Blue above ground storage tank, the installation of 2no. fuel pumps and all ancillary site works
Erect 1256.36 sq m of photovoltaic panels on the roof of the existing building in our factory, trading as DPD HQ Ireland, with all associated site works
Development which will consist of: The Construction of a Temporary Car parking Facility for 195 cars complete with new entrance off existing road network, new fencing, gates, public lighting, landscaping and all associated site works
The brief summarizes the pattern across all 669 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2460473The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.