Free preview / €29 incl. VAT site brief

Site planning risk brief

Fix the brief to an Eircode, a dropped pin or a drawn site boundary. PlanIntel then checks the planning register, available spatial layers, appeals and current indexed policy evidence.
See sample PDF

Define the land to check

Raheens , Kilmeaden , Co. WaterfordOpens secure checkout for the €29 incl. VAT site risk brief. Promotion codes can be entered at checkout.
€29 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

Raheens , Kilmeaden , Co. Waterford

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

13% of nearby decided applications were refused. The site check found 321 decisions within 5 km, 1 exact-site or onsite candidate record, and 12 structured appeals.

Matched source
2460732
Project type
One-off house
Coverage
5 km radius

What this site brief can substantiate today

Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.

Applications tied to the site

Partial coverage

1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.

1 matched

Zoning and settlement

Not yet covered

Current indexed zoning and settlement layers are intersected with the selected site where coverage exists.

Rural-housing policy

Not yet covered

Current section-and-page citations have not yet been loaded for this authority.

Flood, heritage, ecology and archaeology

Not yet covered

Each layer reports its own coverage; missing coverage never appears as a clean result.

Access, road and wastewater prompts

Partial coverage

0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.

Structured appeal history

Confirmed coverage

12 structured nearby appeal records.

12 matched

Current policy citations

Not yet covered

Historic extracted references are not presented as current policy; verified citations are still being loaded.

321Nearby applications
1Site-linked candidates
13%Nearby refused
12Structured appeals

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest planning decisions

2460732

To construct a single-storey extension to the side of existing dwelling, decommission existing septic tank, install a new waste water treatment system and percolation area and all ancillary site works

Granted0.0 km17 April 2025
20223

To raise field levels of existing agricultural lands using clean inert soil and stones (EU Waste Class 17 0504) in order to improve quality of said lands and an area to recycle construction materials

Granted0.7 km18 February 2021
20209

To construct a storey and half dwelling house, installation of a wastewater treatment system and percolation area, new site entrance and associated site works at

Granted0.9 km30 June 2020
1932

To amend the consented planning application 16/737 which consists of a 3.5MW ground mounted solar photovoltaic(PV) farm to generate renewable electricity on a 26.5 hectare site. The consented development comprises solar arrays, associated electrical infrastructure, fencing, access improvements and ecologically beneficial landscape works on lands. Permission sought to amend Condition 2 and thereby change the permission period from 10 years to 5 years and to extend the lifespan of the consented development from 25 years to 35 years. Permission is sought to amend the consented layout by: Reducing the length of the internal access track from c1,383m to c.816m; Removing the six substations/energy storage containers (6x9m length by 3m width by 3mHeight); Relocating the temporary construction compound area to the field to the west and increased in size from c.2400m2 to c.5000m2(building dimensions remain unchanged from consented temporary construction compound details). Removing the energy storage area within the northeast of the Development Site (reducing the ground disturbance area from 500m2 to 0 and Height to 0); Moving the eastern perimeter fence-line including CCTV cameras to c.150m to the west in order to be closer to the revised solar panels extent; and increasing the height of the solar panels slightly from 2300mm to 2500mm, and amending their angle span from 20-30 degrees to 10-40 degrees

Granted0.9 km19 March 2019
21304

For the indefinite retention permission of the following works to existing dwelling house comprising the construction of a new sunroom to the front (north west) of the existing dwelling house and the construction of a standalone single storey garage, together with all ancilliary and associated site works at

Granted0.9 km03 June 2021
22737

A slatted tank/holding yard, meal bin and extension to an existing milking parlour and calf shed granted under PP 16/578 and planning permission to install a solar photovoltaic (PV) renewal electricity generation system on the farm comprising of 150 ground mounted solar panels standing at an overall height of 2m above ground level of and associated site works

Granted1.0 km11 October 2022

The brief summarizes the pattern across all 321 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Exact site history and boundary checks

Site brief

Policy and mapped constraints

Site brief

Appeals and comparable decisions

Site brief

Deterministic risk prompts

Site brief
Ready to get the site risk brief?€29 incl. VAT once-off PDF, no account required