Applications tied to the site
Partial coverage7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 1,181 decisions within 5 km, 7 exact-site or onsite candidate records, and 125 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
125 structured nearby appeal records.
125 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(a) Retention Permission to retain partially constructed structure (b) Permission to complete partially constructed structure for residential use, demolish existing single storey extension and add a new single storey extension to existing dwelling house which will connect the partially constructed structure to the existing dwelling house for residential use as an integral part of the existing dwelling house
CONSTRCT A BAY WINDOW TO THE FRONT OF OUR PROPERTY
DEMOLISH PART OF EXISTING HOUSE, MAKE ELEVATIONAL CHANGES, CONNECT TO PUBLIC SEWER AND DECOMMISSION EXISTING SEPTIC TANK
EXTEND AND MAKE ELEVATIONAL CHANGES TO EXISTING DWELLING HOUSE
(A) DEMOLISH EXISTING DWELLING, (B) CONSTRUCT 4 IN NUMBER 1 BEDROOM APARTMENTS, (C) CONSTRUCT 1 IN NUMBER 2 BEDROOM APARTMENTS, (D) CONSTRUCT NEW ENTRANCE AND ALL ASSOCIATED SITE WORKS
CONSTRUCT A COMMUNITY RECREATIONAL AREA TO INCLUDE A MULTI-USE GAMES AREA (MUGA) WITH 2 NO. GOAL ENDS AND BASKETBALL HOOPS, OUTDOOR EXERCISE AREA, ERECTION OF 3.0M HIGH FENCING, ASSOCIATED PEDESTRIAN ACCESS AND ANCILLARY SITE WORKS
The brief summarizes the pattern across all 1,181 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2460897The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief