Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 49 decisions within 5 km, 2 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The amendments to Upperchurch Windfarm Electrical Substation authorised under An Bord Pleanála Ref. No. Pl.22.243040 and PA92.310171. The amendments consist of a) increase in size of the substation compound yard; b) change to the layout of electrical equipment in the substation compound yard; c) change in size, design and increase in height of the two control buildings and d) ancillary works. The application is accompanied by an Appropriate Assessment Report (stage 1 – screening) and screening for Environmental Impact Assessment (EIA) report
Amendments to Upperchurch Windfarm Electrical Substation, authorised under An Bord Pleanala ref no PL.22.243040; Tipperary County Council REF: NO. 13/510003. The amendments consist of: a) Increase in size of the Substation compound yard; b) Change to the layout of Electrical equipment in the substation compound yard; c) Change in size, deisgn and increase in height of the two Control Buildings and d) Ancillary works. The application is accompanied by an Appropriate Assessment Report (Stage 1 - screening) and screening for Environmental Impact Assessment (EIA) Report
Construction of a slatted cattle house with roofed cattle crush and handling area including under slat slurry storage and associated site works
Construction of a two-storey dwelling house, domestic garage, waste water treatment and disposal system, entrance and all associated site works
One permanent meteorological mast 35m in height and associated infrastructure
To relocate entrance, renovate existing dwelling, construction of a new single storey extension, new septic tank, percolation area and all associated site works
The brief summarizes the pattern across all 49 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2460901The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief