Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
1% of nearby decided applications were refused. The site check found 90 decisions within 5 km, 1 exact-site or onsite candidate record, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of an anaerobic digestion plant comprising: 4 no. primary digester tanks (each measuring c. 7.6 m in height); 3 no. secondary digester tanks (each measuring c. 14.5 m in height); 4 no. feed hoppers; 4 no. technical rooms (ranging in size from c. 35 sq m to c. 95 sq m GFA); 2 no. biogas conditioning units; process, storage and buffer tanks (comprising: 1 no. buffer digestate storage tank (c. 7.5 m in height), 1 no. suspension buffer tank (c. 8 m in height), 1 no. process area runoff storage tank (c. 4.5 m in height); 1 no. buffer digestate process tank (c. 4.5 m in height), 1 no. treated digestate liquids recycle storage tank (c. 4.5 m in height); 1 no. roofed liquids feed-mix tank (c. 3 m in height)); these components will be located within a containment bund constructed c. 3 m below ground level. The proposed development will also consist of: feedstock storage (comprising 3 no. storage clamps (c. 1,050 sq m in area each) and 2 no. storage sheds (c. 500 sq m GFA each)); a biomethane upgrading plant (including natural gas compression unit); a biomethane loading facility (comprising 4 no. loading bays with associated gates and safety features measuring c. 490 sq m in area); a biomass boiler with its associated pellet storage silo (c. 12.5 m in height); Combined Heat and Power (CHP) plant and associated heat exchanger; a single storey bio-based fertiliser processing and storage unit (c. 3,890 sq m GFA) (including digestate dewatering plant, fertiliser pasteurisation plant and bio-based fertiliser loading facilities); a single storey office building (c. 105 sq m GFA) (including offices, meeting room, control room, laboratory, welfare facilities, storeroom and a first-aid facility); bin storage; 9 no. car parking spaces (including 5 no. standard parking spaces, 2 no. electric vehicle (EV) spaces and 1 no. accessible car parking space); electric vehicle (EV) charging infrastructure; 10 no. bicycle parking spaces; vehicular, cyclist and pedestrian access / egress and associated circulation routes; 2 no. weighbridges; a vehicle steam wash area; fuel storage tank and associated bund; an emergency flare (c. 7.6 m in height); a process area runoff lagoon; an attenuation pond; an ESB sub-station; boundary treatments [including gates, piers and fencing]; site lighting; all hard and soft landscaping; provision of sustainable urban drainage systems (SUDS); and all other associated site excavation, infrastructural and all other associated site excavation
The development will consist of a Phase III mushroom substrate (compost) production facility and will involve the construction of an administration building (296.16 sq. m), storage building (8444.04 sq. m), bunker building (9967.59 sq. m), tunnel building (10628.75 sq. m), woodchip bio-filter, wheelwash, weighbridge, 6 no. water storage tanks, 2 no. fuel storage tanks, well, wastewater treatment system, hardstanding areas, internal access roads, parking facilities, boundary fencing, landscaping, and all ancillary works. An Environmental Impact Statement (EIS) will be submitted with the planning application. The application relates to development which comprises or is for the purposes of an activity requiring an Integrated Pollution Prevention and Control Licence or a Waste Licence
1) Demolition of the existing loading bay canopy 2) Change of use from maintenance depot to an agri-food sector Research and Development Unit for light indutrial use with ancillary office space 3) Extension of the existing first floor accomodation by 169 sqm. 4) Construction of an external stair to the rear, additional windows to the front and rear elevations with an external perforated printed mesh screen fixed to the front and south gable elevation, canopy over the front entrance door and an array of PV Panels fixed to the roof 5) Landscape works including a waste water treatment plant and car parking with 4 no. electric vehicle chargers
Works within the boundary of the existing Lisheen 110 kV Substation, the proposed works will comprise: replacement and improvement works to an existing electrical transformer bund; construction of two new concrete plinths for associated electrical infrastructure; installation of electrical infrastructure; and underground cable connection from the electrical infrastructure to the existing substation control building. The application is accompanied by a Planning and Environmental Report and Appropriate Assessment Screening Report
Development consisting of Workshop Building (1242m2), Truck Washout Building (64m2), commercial yard area, new boundary fence and entrance gates, an on-site Wastewater Treatment System and associated polishing filter bed percolation area, attenuation tank, bored well & water storage tank, rainwater harvesting tank, emergency storage tank, solar panels to roof of existing building and all associated siteworks - application is accompanied by an NIS
Change of design and subsequent boundary adjustment to granted planning permission Ref: 2460918
The brief summarizes the pattern across all 90 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2460936The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief