Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 118 decisions within 5 km, 3 exact-site or onsite candidate records, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Tipperary County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Tipperary County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Tipperary County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedNo current-dated citation is loaded for Tipperary County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
The indefinite retention of a single storey extension to the side of the dwelling; indefinite retention of 3 detached sheds, each housing: 1) a playroom, 2) a home office and 3) a garage all located at the rear of the dwelling. Full Planning Permission to remove an existing kitchen extension and replace with a new larger kitchen/dining/living room extension at the rear of the existing dwelling, along with modifications to the windows and external wall finish. Permission to replace the mono pitch roof on the existing retained garage with a pitched roof
A new single storey dwelling, detached domestic garage, waste water treatment system, new site entrance, plus all associated site works
Permission to construct Slatted feeding area with underground effluent tank and loose shed area and all associated site works
The as constructed single-storey dwelling. Permission is also sought to install new effluent treatment system, including permission to upgrade the existing septic tank and percolation area on site, modify existing vehicular entrances, site boundaries and all associated site development works
A new stand-alone domestic garage (120m2) and associated site works to side of existing cottage
The development consists of: 1. Construction of a detached two storey dwelling and a detached single storey domestic garage. 2. Installation of a proprietary domestic effluent treatment system and sand polishing filter, to appropriate standards. 3. Construction of a site entrance consisting of walls, piers, entrance gates and hedging and also, the realignment and improvement works to two existing agricultural site entrances. 4. Construction of a driveway, parking areas, footpaths, patio and hard landscaping areas. 5. Landscaping of the site consisting of new grass areas, planting beds, trees, hedging and shrubbery and all associated site works.
The brief summarizes the pattern across all 118 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2461075The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief