Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 106 decisions within 5 km, 1 exact-site or onsite candidate record, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Development which consists of 21 two storey dwellings contained in six terraced blocks. Block A consisting of 1no. four bedroom and 2no. three bedroom houses, Block B consisting of 3no., three bedroom houses, Block C consisting of 1no. four bedroom house and 2no. three bedroom houses, Block D consisting of 1no., four bedroom house and 3no., three bedroom houses, Block E consisting of 4no., three bedroom houses and Block F consisting of 4no, three bedroom houses (total 3no. four bedroom houses and 18no. Three bedroom houses). Permission also sought for new site entrance, onsite car parking and all associated site works
Construction of 6 no. townhouse type dwellings (comprising of 2 no. blocks of 3 bedroom dwellings), form new entrances onto public road, connect to public sewerage system and all ancillary site development works
Development which will consist of Permission for Retention of the building constructed under Planning Permission Register Number PL25.C.237623. The development includes. 1. The retention of 2 No. 2 bed apartments at first floor level including change of use from office to part of an apartment (Units No. 5 & 6). 2. Permission for the change of use of the ground floor shops to 2 No. one bed apartments (Units No. 1 & 2). 3. Permission to build a 2 storey extension and provide 1 No one bed apartment at ground floor level (Unit No. 4) and 1 No one bed apartment at first floor level (Unit No. 7). 4. Amend layout of 1 No. 1 bed ground floor apartment (Unit No. 3). Provision of balconies including alterations to elevations. Total number of apartments is 7 including amenity area, parking, bike and bin stores
Alterations to the Planning Permissions PL25.C.237623, conversion of 2 no unoccupied shops and office to apartments and extension of the building to create 7 no. apartments (3 existing apartments and 4 new apartments) including amenity area, parking, bike and bin stores
Replace an existing 10m high wooden pole with a 21m high telecommunications monopole, together with antennas, dishes and associated telecommunications equipment enclosed by security fencing
Change of use of Existing Licence Premises, Betting Office, Small Retail Unit to One Single Licensed Retail Unit which will include an Off Licence Area. Change in Shop Front, Signage, Self contained one bedroom apartment to the rear of premises, connection to all services and all site works
The brief summarizes the pattern across all 106 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2560071The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief