Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 38 decisions within 5 km, 3 exact-site or onsite candidate records, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(1). construct a pontoon jetty and all ancillary works. (2). Retention permission to retain a detached sauna.
(a) construct a domestic fuel storage shed; (b) upgrade the existing waste water treatment facility to an onsite waste water treatment facility which complies with the current EPA CoP and all ancillary works
1. To construct roof over existing open yard area to provide manure pit and sheep shed to the North Eastern side of existing sheds, connect to existing underground agricultural storage tank. 2. To construct roof over existing open yard area to provide dry bedding area and feeding area to the South Western side of existing sheds, connect to existing underground agricultural storage tank, including all ancillary site works necessary to complete the development.
(a) demolish existing non habitable dwelling house and outbuilding, (b) construct bungalow type dwelling home, domestic garage, mechanical effluent treatment unit and percolation area, (c) Upgrade existing site entrance to include provision of new front boundary wall and access road including all ancillary works necessary to complete the development
Development consisting of construction of a new private dormer type domestic dwelling, private domestic garage to rear, effluent treatment unit and percolation area to EN 125663 & SR.66, new entrance gate piers, front wall and driveway and associated site works
1. To demolish existing non habitable dwelling house and outbuilding including de-commissioning existing septic tank. 2. To erect single storey dwelling on footprint of existing dwelling. To erect domestic garage. To erect new gate, wing walls and piers on existing access road. 3. Connect to existing public sewer and all ancillary works necessary to complete the development
The brief summarizes the pattern across all 38 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2560227The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief