Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 1,130 decisions within 5 km, 2 exact-site or onsite candidate records, and 94 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
94 structured nearby appeal records.
94 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For development. The development will consist of planning permission for a period of 10 years to construct and complete a solar PV energy development, battery storage and grid route with a total site area of 25.1 hectares, comprising of the construction of PV panels mounted on metal frames, MV Power Stations, substation, batteries, MV stations, new access tracks, underground cabling and ducting, perimeter fencing with CCTV cameras and access gates, a temporary construction compound, 10kV underground cabling connecting the solar farm to the existing Rosehill 38kV substation, and all ancillary grid infrastructure and associated works. The proposed development consists of works within the curtilage of Protected Structures Ref. C1000, C1002 and C330. The development would be operational for 40 years. A Natura Impact Statement (NIS) has been prepared in respect of this application
For the construction of a new access road on to the Ballycallan Road (R695) to serve the Castle Blunden Estate. The existing substandard access road on to the Ballycallan Road (R695) is to be decommissioned. Works to include a new bellmouth entrance and all other ancillary site works, at the above address. The proposed development consists of works within the curtilage of a Protected Structure, Ref C1002 and C330, Castleblunden farmyard complex and Castleblunden Country House
For a) change of house design from two storey dwelling to single storey dwelling with attached car port & domestic garage & b) modification of the house position on the site to Planning Ref No. 18.718 with all previously permitted associated site works
TO RETAIN, FOUNDATIONS, BASE TO FLOOR LEVEL AND RISING BLOCK WORK TO VARIOUS LEVELS AS CURRENTLY CONSTRUCTED. (THE PREVIOUS CONSENTS PERTAINING TO THIS DEVELOPMENT; 18/718 – INITIAL CONSENT FOR TWO STOREY DWELLING HOUSE, ENTRANCE AND ASSOCIATED SITE WORKS, & 23/152 – CONSENT FOR CHANGE OF HOUSE TYPE FROM TWO STOREY TO SINGLE STOREY DESIGN) B) PLANNING PERMISSION TO CONSTRUCT A SINGLE STOREY DESIGN DWELLING, THE PROVISION OF AN ANCILLARY GARAGE, PROVISION OF ETU WITH PERCOLATION AREA, SITE ENTRANCE AND ALL ASSOCIATED SITE WORKS
Of Planning Permission Ref P23/152 and P18/718
To construct/install a new dwelling, domestic garage, on-site wastewater treatment and disposal system, new entrance, private well and all associated site works on our site
The brief summarizes the pattern across all 1,130 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2560416The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief