Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 180 decisions within 5 km, 1 exact-site or onsite candidate record, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For (total c. 1.2 hectares) consisting of rock extraction outside of the existing permitted extraction areas under P. Reg. Ref. 05/1927
For the revisions to previous grant of Planning Ref. 12/250 (extension of time Ref. 17/486) to consist of an increase in eaves & ridge height of 1.5 metres over 2 no bays and the addition of 2 no roller doors to the side of said building and associated site works
For the installation of a Roof Mounted Solar PV Panel Array consisting of up to 1280m2 of solar panels with a peak capacity of up to 258Kwp mounted to the roofs of two industrial buildings via steel frames, including routing cable, trenching and backfilling of cables and all associated works
For the erection of a cubicle house with slatted slurry storage tank, new silage pit and new over ground slurry storage tank and all associated site works at
Is hereby sought for construction of two storey dwelling, entrance, foul effluent treatment system, percolation area, all associated site works
For construction of two storey dwelling, entrance, foul effluent treatment system, percolation area and all associated site works
The brief summarizes the pattern across all 180 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2560634The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief