Free preview / €29 incl. VAT site brief

Site planning risk brief

Fix the brief to an Eircode, a dropped pin or a drawn site boundary. PlanIntel then checks the planning register, available spatial layers, appeals and current indexed policy evidence.
See sample PDF

Define the land to check

Kellymount Quarry , Kellymount and Shankill Townlands , Paulstown Co. KilkennyOpens secure checkout for the €29 incl. VAT site risk brief. Promotion codes can be entered at checkout.
€29 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

Kellymount Quarry , Kellymount and Shankill Townlands , Paulstown Co. Kilkenny

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

6% of nearby decided applications were refused. The site check found 180 decisions within 5 km, 1 exact-site or onsite candidate record, and 4 structured appeals.

Matched source
2560634
Project type
One-off house
Coverage
5 km radius

What this site brief can substantiate today

Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.

Applications tied to the site

Partial coverage

1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.

1 matched

Zoning and settlement

Not yet covered

Current indexed zoning and settlement layers are intersected with the selected site where coverage exists.

Rural-housing policy

Not yet covered

Current section-and-page citations have not yet been loaded for this authority.

Flood, heritage, ecology and archaeology

Not yet covered

Each layer reports its own coverage; missing coverage never appears as a clean result.

Access, road and wastewater prompts

Partial coverage

0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.

Structured appeal history

Confirmed coverage

4 structured nearby appeal records.

4 matched

Current policy citations

Not yet covered

Historic extracted references are not presented as current policy; verified citations are still being loaded.

180Nearby applications
1Site-linked candidates
6%Nearby refused
4Structured appeals

Top refusal reasons nearby

Ecology1

Nearest planning decisions

2560634

For (total c. 1.2 hectares) consisting of rock extraction outside of the existing permitted extraction areas under P. Reg. Ref. 05/1927

Granted0.0 km27 May 2026
19375

For the revisions to previous grant of Planning Ref. 12/250 (extension of time Ref. 17/486) to consist of an increase in eaves & ridge height of 1.5 metres over 2 no bays and the addition of 2 no roller doors to the side of said building and associated site works

Granted0.3 km22 July 2019
22399

For the installation of a Roof Mounted Solar PV Panel Array consisting of up to 1280m2 of solar panels with a peak capacity of up to 258Kwp mounted to the roofs of two industrial buildings via steel frames, including routing cable, trenching and backfilling of cables and all associated works

Granted0.3 km18 November 2022
18408

For the erection of a cubicle house with slatted slurry storage tank, new silage pit and new over ground slurry storage tank and all associated site works at

Granted0.4 km02 August 2018
22489

Is hereby sought for construction of two storey dwelling, entrance, foul effluent treatment system, percolation area, all associated site works

Granted0.6 km31 March 2023
22274

For construction of two storey dwelling, entrance, foul effluent treatment system, percolation area and all associated site works

Refused0.6 km17 June 2022

The brief summarizes the pattern across all 180 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Exact site history and boundary checks

Site brief

Policy and mapped constraints

Site brief

Appeals and comparable decisions

Site brief

Deterministic risk prompts

Site brief
Ready to get the site risk brief?€29 incl. VAT once-off PDF, no account required