Applications tied to the site
Partial coverage7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
17% of nearby decided applications were refused. The site check found 254 decisions within 5 km, 7 exact-site or onsite candidate records, and 9 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
9 structured nearby appeal records.
9 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(i) The demolition of 2no. Existing Commercial Units and partial demolition and modifications to 1no existing Commercial Unit, (ii) The construction of a Sport Facility Building enclosing 3no. Padel Courts and an entrance lobby, (iii) a separate WC Block, (iv) 1no. high power electric vehicle charging unit and 2no. vehicle charging bays and associated electric vehicle infrastructure, (v)Signage elements, (vi) and site lighting, drainage and all other associated site development works
CAR REPAIR INDUSTRIAL UNIT, ANCILLARY OFFICE AND TOILETS UNITS, CARPARKING AND ALL ASSOCIATED SITE, DRAINAGE AND BOUNDARY WORKS
(1) INSTALLATION OF SOLAR PHOTOVOLTAIC PANELS AND ASSOCIATED FIXTURES AND FITTINGS ON THE ROOFS OF THE EXISTING AMENITY BUILDING AND 2 NO. COMMERCIAL BUILDINGS, AND (2) ALL OTHER ASSOCIATED INFRASTRUCTURE AND SITE DEVELOPMENT WORKS
(I) CHANGE OF USE FROM A COMMERCIAL USE OF THE FIRST FLOOR AT THE EXISTING EDEN PHISIOTHERAPY AND ACCUPUNCTURE BUILDING TO A RESIDENTIAL USE, AND (II) ALL ASSOCIATED SITE AND DEVELOPMENT WORKS
Change of use from existing store to Veterinary Clinic. Former Railway Ticket Office is a protected structure No. 17-09 and NIAH No. 14804009.
EXISTING TWO STOREY EXTENSION (GROUND FLOOR AREA =45.8SQ M, FIRST FLOOR AREA = 45.8SQ M) TO REAR/ NORTHWEST OF EXISTING DWELLING. RETENTION IS ALSO SOUGHT FOR THE ALTERATIONS TO FRONT ELEVATION WINDOWS OPENINGS AND DOOR (SOUTHEAST) AND ALL ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 254 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2560663The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief