Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 1,583 decisions within 5 km, 1 exact-site or onsite candidate record, and 147 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
147 structured nearby appeal records.
147 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To construct a single dwelling house, garage, advanced wastewater treatment system along with ancillary site works
Road boundary wall and entrance, storage shed to rear of dwelling, waster water treatment system and percolation area and associated site works
The construction of 98 residential units comprising of the following: 46 no. 2 storey, 4 bed, semi-detached units; 42 no. 2 storey, 3 bedroom semi detached units: 6 no. single storey, 2 bed, end of terrace units and 4 no. single storey 2 bed, mid terrace units. Installation of all necessary and associated site works to include vehicular and pedestrian connections to public roundabout (currently under construction), on Pass (Meelick) Road, roadways, footpaths, green spaces, landscaping and boundary treatments, together with all associated drainage connection works and all ancillary site works. A Natura Impact Statement and an EIAR accompanies this application.
For the construction of a single story extension to the side and rear of an existing dwelling, new wastewater treatment system and polishing filter and all ancillary works
Alterations to housing development granted under planning permission ref number 22/959. The proposed alterations include the following: a) change of house type from 18 no. 3 bed 2-storey semi-detached dwellings (Type C1&C1h’ – units no. 77-86 & 91-98 inclusive), b) change of house type from 4 no. 4 bed 2-storey semi-detached dwellings (Type B1&B1h’ - no. 87-90 inclusive), c) change of house type from 2 no. blocks of terrace dwellings consisting of 3 no. 2 bed bungalows in each block (Type D1&D2&D3 – no. 18-20 inclusive and Type D1h’&D2h’&D3h’ – no. 15-17 inclusive) to: a) 3 no. blocks of terrace dwellings consisting of 6 no. 2 bed bungalows in each block (Type E&E1&E1h’& E1&E1h’&Eh’ – units no. 81-86, 87-92 and 93-98 inclusive), b) 2 no. 3 bed 2-storey semi-detached dwellings (Type C2&C2h’ – units no. 79-80), c) 2 no. blocks of terrace dwellings consisting of 2 no. 3 bed & 2 no. 2 bed 2-storey houses in each block (Type F&G&G1h’&Fh’ – units no. 15-18 & 19-22 inclusive), d) minor repositioning of car parking spaces for units no. 79-98, 15-18 & 19-22 inclusive, together with all associated site works
An extension to the existing dwelling house including the following; (1) alterations to the front façade, (2) realignment of the front boundary wall and entrance, (3) new driveway, and all ancillary site development works
The brief summarizes the pattern across all 1,583 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2560739The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief