Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 42 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Cavan County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Cavan County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Cavan County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
No current-dated citation is loaded for Cavan County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
The development consists of: 1. To construct a single storey domestic extension to the existing dwelling. 2.To demolish the existing two chimneys on the existing dwelling. 3.To carry out alterations to the existing elevations. 4. To upgrade the existing wastewater treatment system to the current EPA code of practise and all ancillary works
To construct a storey and 1/2 building over basement for self catering accommodation with garage/ store (domestic) and bedroom accommodation on basement level with rear access, habitable accommodation on ground and first floors, connection to existing town sewerage, water services, entrance and all associated works as previously granted for dwelling 17/208
EXTENSION OF DURATION of 17/208: to construct a dormer type dwelling with garage (domestic) and habitable rooms in basement with openings to the rear, connect to existing town of Blacklion water and sewerage services, construct entrance and all associated services
1. to construct a two-storey type domestic dwelling, 2. to construct a domestic garage, 3. to construct a new site entrance and 4. to construct a waste water treatment system to the current EPA Code of Practice and all ancillary works
EXTENSION OF DURATION 16/129: to complete dwelling as granted 10/278 and permission to retain connection to Blacklion town sewer
For RETENTION of alterations to as built development previously approved under planning reference 95/407 which includes retention permission for (a) house position, (b) conversion of carport into habitable space (c) detached domestic shed together with planning PERMISSION to upgrade wastewater treatment system and provide new percolation area together with sightline improvement works and associated site works at Termon, Blacklion Co. Cavan. (Eircode F91 A9Y2)
The brief summarizes the pattern across all 42 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2560756The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief