Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 213 decisions within 5 km, 1 exact-site or onsite candidate record, and 9 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Tipperary County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Tipperary County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Tipperary County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
9 structured nearby appeal records.
9 matchedNo current-dated citation is loaded for Tipperary County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Construction of a dwelling house, domestic garage, effluent treatment system and percolation area, entrance and all other associated site works
(1) demolish exising side and rear extension (2) construct new side and rear extension (3) re-orientate existing entrance and all associated site works
(1) the provision of a 2,416 square metre defined recycling area in the pit floor; (2) the processing of up to 19,500 tonnes of waste concrete annually using a mobile crushing and screening plant; (3) stockpiling of waste concrete prior to processing and (4) stockpiling of recycled aggregates prior to transport off-site for use in construction works
(a) construction of a steel framed lime storage shed (11.96m high with a gross floor area of 400m2); (b) new single storey rear and side extension to existing site office building (new additional gross floor area of 88.9m2, total combined gross floor area of 131.5m2) consisting of office and welfare facilities; (c) all ancillary works
Construction of two extensions to dwelling consisting of lounge and master bedroom and Permission to construct domestic garage and associated site works
The following development: (a) front porch, (b) rear extension, (c) revised front/roadside boundary including revisions to the existing site entrance, and (d) upgraded on-site wastewater treatment & disposal system serving the existing dwelling house and all associated ancillary works
The brief summarizes the pattern across all 213 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2561185The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief