Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 149 decisions within 5 km, 3 exact-site or onsite candidate records, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Planning permission to import brownfield soil and stone By-Product in the context of 27 of the European Communities (Waste Directive) Regulations 2011 and greenfield soil and stone By-Product as defined in the National By-Product Criteria for Greenfield Soil and Stone (BP-N002/2024) to raise the level of existing lands in order to improve the agricultural value of the site and all associated site works
The filling of the former quarry, to reinstate ground to new levels and all associated site works
The demolition of existing substandard dwelling house; construction of 3 dwelling houses with associated entrances & car parking; connection to mains services, together with all associated site works
Construction of a wastewater pumping station and associated site works
Construction of an extension to dwelling house and ancillary works
Multi-purpose community leisure complex which will be developed in 2 phases. Phase 1 includes the provision of 2 dressing rooms and a first floor meeting room with ancillary areas and phase 2 includes a multi purpose hall with an upper viewing area with all associated works
The brief summarizes the pattern across all 149 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2660490The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief