Executive snapshot
11% of nearby decided applications were refused. The site check found 1,386 decisions within 5 km, 5 exact-site or onsite candidate records, and 121 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
121 structured nearby appeal records.
121 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Retention development consists of the construction of a porch to the front of the existing family home to include all associated site works.
Retention permission for 1. single storey ground floor extension to the front of the dwelling with new lean-to roof which extends over existing porch; 2. single storey flat roof ground floor extension to the rear of the dwelling; 3. new mono pitch roof over existing single storey extension to the rear of dwelling; 4. new corner window to existing single storey extension to the rear of dwelling; 5. landscaping and all associated site works
Permission for the creation of a new vehicular access and provision of car parking in the front garden of the property
Retention and permission for completion of works of an existing single storey detached home office and gym area (45.42m2). This is ancillary to my existing dwelling and located to the rear of existing dwelling. Permission also sought for all ancillary site development works and services **Significant further information recieved on 29.11.22**
Retention and Permission Application consisting of Retention Permission for an existing domestic garage on a parcel of land located 20 metres to the north-west of 7 Weir Hope and Permission for 2 no. rear roof windows to include all associated alterations to the roof
Permission for the development of electrical charging infrastructure for its Battery Electrical Multiple Units (BEMU) fleet at Drogheda MacBride Railway Station. Comprising of the construction of a modular 10kv ESB/traction substation in the lower car park of the railway station, overhead line charging facilities at 2 no. platforms and 1 no. depot track and electrical cables in ducts form the substation to the charging facilities, together with all necessary ancillary works. The proposed works include: - ESB/Traction substation, comprising two separate adjacent compounds (one for ESB and one for Iarnród Éireann) with - ESB compound comprisin ga building c.4.4m x 4.9m x 2.95m high, dedicated pedestrian and vehicular access, 2 no. dedicated car parking spaces and security fencing; - A number of car parking spaces within the lower car park will be removed to accommodate the proposed substation, reducing the available car parking spaces from 98 to 44 spaces; - Iarnród Éireann compound comprising up to 5 no. modular containerised units, c. 2.6m x 8.0m x 3.5m high, pedestrian access and security fencing; - Ancillary works including landscaping, drainage and utilities; - Electrical cabling works, underground and partially buried in cable troughs between the ESB/Traction substation and overhead line charging infrastructure; - Overhead Line Charging Infrastructure; - Provision of overhead line charging infrastructure at 2 no. platforms and 1 no. depot track; - These structures will be galvanised metal structures from 12 masts and will comprise 2 portal frames, 4 double cantilever and 4 single cantilevers; - Ancillary works, including minor relocation of services, drainage and replacement of steel wire mesh protection on the private access staff pedestrian overbridge. The proposed development is within the curtilage of protected structures, The Drogheda MacBride Station, the associated station complex as well as the Boyne Viaduct: Station buildings include shed, turntable RPS - DB-055; Boyne Viaduct RPS - DB-176. A Natura Impact Statement accompanies this application **Significant further information received on 13.12.22**
The brief summarizes the pattern across all 1,386 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2660333The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief