Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 131 decisions within 5 km, 1 exact-site or onsite candidate record, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Development of an existing entrance and upgrade it to forestry harvesting standard (bell mouth entrance) onto public road to facilitate access to forestry plantation together with internal access road and all associated site works.
Permission to erect a dormer style house, domestic garage, install a package waste water treatment system with percolation area to EPA specifications, a new site entrance and all necessary associated site works
To retain and complete my existing garage to include fuel storage and storage area with all ancillary site works
The development to consist of the construction of a two-storey detached dwelling, detached garage, proposed entrance off the public road, wastewater treatment system and packaged tertiary unit and all ancillary site works
To convert and extend an existing stone shed into tourist accommodation, install a proprietary effluent treatment system and percolation area, use existing entrance onto public road and all ancillary site services
Demolish rear single storey utility and WC, construct rear two storey extension, modifications to existing front two storey front porch and upgrade existing septic tank and percolation area and all associated site works
The brief summarizes the pattern across all 131 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 186060The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief