Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 149 decisions within 5 km, 1 exact-site or onsite candidate record, and 7 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
7 structured nearby appeal records.
7 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Development of an existing entrance and upgrade it to forestry harvesting standard (bell mouth entrance) onto public road to facilitate access to forestry plantation together with internal access road and all associated site works.
To construct a private dwelling house, proprietary effluent treatment system and percolation area, domestic garage, entrance onto public road and all ancillary site services at
Demolish existing single storey rear extension, construct a 1.5 storey rear extension to existing dwelling incorporating a Kitchen/living/dining and utility and WC at ground floor and 2 no bedrooms at 1st floor, make internal alterations and modifications to existing dwelling, to install a proprietary waste water treatment system and percolation area to service existing dwelling. Existing septic tank to be decommissioned and sterilized.
Construction of three bell mouth entrances A, B and C onto public roads to facilitate access to forestry plantations together with internal access roads and turning heads and all associated site works.
Planning permission for a private dwelling house, domestic garage, proprietary effluent treatment system and percolation area, entrance onto public road and all ancillary site services
The installation of 500m2 (100Kw) of ground mounted solar photovoltaic (PV) panels and all associated ancillary works
The brief summarizes the pattern across all 149 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 186061The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief