10% of nearby decided applications were refused. The site check found 185 decisions within 5 km, 1 exact-site or onsite candidate record, and 7 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
7 structured nearby appeal records.
7 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of cubicle shed with slatted tank, milking parlour and all ancillary site works.
Retain existing dwelling house, garage, septic tank, percolation area and all ancillary site works
Retention permission for a domestic garage constructed at the rear of my dwelling house and all associated site works
To construct a new dwelling, entrance onto public road, proprietary effluent treatment system and a tertiary sand filter with a gravel infiltration bed and all associated site works.
Development which will consist of the installation of a 15 metres monopole carrying antennas, a dish, associated equipment, together with ground-based equipment cabinets, fence and all associated site development works for wireless data and broadband services
EXTENTION OF DURATION for intensification of use at this site from 10,000 tonnes of WEEE and metal waste per annu to 50,000 tonnes of WEEE and metal waste per annum and installation of a second external air handling unit, (2) construct a new canopy roof (2,715m) covering to existing open yard to west side of the existing building with open sides to front (south) and rear (north) and part-open side to west side with minor modifications to feature cladding of existing building to accommodate the proposed new canopy roof (3) Weighbridge Station building (35m) to western side of the existing building with 2 No. Weighbridges (4) MV Substation Building (14m) to eastern side of and adjoining the existing building (5) New vehicular and pedestrian entrance to site from R446, including modifications to existing boundary fence and new gates and rearrangement of existing vehicle parking on the site (6) Proposed new signage including 4.0m high totem sign adjacent to main road and new plinth signage at new entrance (7) two 10,000L overground rainwater harvesting tanks to rear of site (8) Proposed minor modifications to existing underground services and all associated underground and overground site works. An Environmental Impact Statement Assessment has been prepared and will be submitted with this application. This development will also require an Industrial Emissions Licence from the Environmental Protection Agency
The brief summarizes the pattern across all 185 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 186287The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.