Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 695 decisions within 5 km, 3 exact-site or onsite candidate records, and 40 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
40 structured nearby appeal records.
40 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The change of use of existing building from an Industrial Unit into a Fitness Centre. The proposal includes conversion of 2 sub units into 1 unit, alterations to ground floor internal layout, conversion of existing first floor area from office to fitness class studio, blocking off existing stairs and provision of new access stairs to first floor area, extension of first floor area, addition of mezzanine floor with access stairs, conversion of single access door to double doors at northwest elevation of the building
To RETAIN the part change of use from light engineering/ technology to a retail area (24.5sqm) at the front (southwest) of the building (Speedyparts) and all associated site works
Construction of a first floor extension to the side of existing dwelling to include two bedrooms and a landing and a ground floor extension to the rear to include a dining area and construction of a detached garage at the rear with all ancillary site works
Reconfiguration and extension of ground floor and first floor office areas and a new mezzanine office area at second floor level within existing industrial unit, to include a new door and alterations to existing windows and new elevation treatment to all elevations and proposed solar panels installed on roof and all associated site works and services
Proposed new 2 storey Enterprise unit consisting of 4 No. light Industrial Units for start-up & Incubation Business in the food industry, including single storey maintenance and staff canteen units with associated PV Panels, New signage, new covered EV charging carport with associated PV Panels, adjustment to existing site entrance gate to provide new pedestrian entrance gate, extension to existing internal access road with new carparking layout, loading areas, bicycle parking including stands/shelter, external bin, bicycle and liquid gas stores, all associated hard and soft landscaping, public lighting, connections to existing services and to carry out all associated ancillary site works above and below ground
(a) the change of use of the existing building from an Industrial Unit for car repairs, as permitted under Planning Reg. No. 00/384, to Storage Warehouse (700SqM) including associated trade shop (76 Sqm), (b) internal alterations, (c) provide new illuminated signage to west elevation and (d) carry out all associated site works. Retention Permission is also sought for 2 No. existing storage sheds (106 SqM)
The brief summarizes the pattern across all 695 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 186340The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief