Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 194 decisions within 5 km, 2 exact-site or onsite candidate records, and 8 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
8 structured nearby appeal records.
8 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of 69 no. two storey dwellings (each dwelling is served by a rear garden private amenity space and 2 no. on-curtilage parking spaces, provision of landscaped public open space (0.83 hectares/8300sqm) to serve the development (and the existing Abbeybrook development) to be located west of Abbeybrook View and east of Kilbeggan Cemetery. This public open space integrates with existing open space (playground) provided to the south east of the Abbeybrook development and provides pedestrian connections to the Lower Main Street. The development also includes a reservation of 0.412 hectares/4120sqm to provide for the future expansion of the Kilbeggan Cemetery and a new vehicular junction with the distributor road serving the Abbeybrook residential development; street lighting; internal roadways; footpaths; foul and SuDS surface drainage; landscaping/boundary treatments and all ancillary infrastructural and engineering works necessary to facilitate the development
Development of a site which extends to 2.718ha, on lands at Abbeybrook, Kilbeggan, Co. Westmeath (located west of Regional Road R389 and south of distributor road serving the Abbeybrook residential development). The proposed development will consist of the following: i) Construction of 74 no. residential units comprising of: a. 62 no. dwellings (4 no. 2-bed, 44 no. 3-bed, 14 no. 4-bed) b. 4 no. 1-bed Apartments and 8 no. 2-bed apartments ii) Provision of new vehicular and pedestrian access to the site, iii) Provision of car and bicycle parking, and vehicular and pedestrian access on site, iv) Provision of public open space, shared communal and private open space, site landscaping, public lighting, bin stores, and site services, v) Works to the distributor road serving Abbeybrook estate, including the provision of a pedestrian crossing and raised table, and alterations to the existing on street parking layout, vi) All ancillary and associated site development works
Demolish previously built extension, renovate existing dwelling and construct a new extension to dwelling, to retain existing public services and all associated site works. Retention permission is also sought for a domestic garage as constructed
Construction of a new extension at the front, side and rear of my existing dwelling to include a porch, dining area and bedroom and to demolish existing shed and to retain existing garage at the rear with all ancillary site works
To construct a new extension to existing dwelling, to retain all existing public services and all associated site works
Proposed development which will consist of decommissioning of the existing Kilbeggan Tullamore Road Wastewater Pumping Station comprising: 1. Demolition of existing control building; 2. Gravity diversion sewers; 3. Removal of existing fencing and hedging and erection of new fencing; 4. Decommissioning existing pipelines and 5. Associated ancillary works including surface reinstatement, all on a site of 0.51 hectares
The brief summarizes the pattern across all 194 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 196084The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief