Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 182 decisions within 5 km, 5 exact-site or onsite candidate records, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
From retail use to retail use with ancillary off licence use
Variations to approved mixed use development granted planning permission under Planning Reference 20/6219 as follows. (A) Omission of basement storage and plant areas throughout. (B) Block B Unit 16 change of use from ground floor commercial to one-bedroom apartment & Unit 18 change of use from ground floor commercial to two-bedroom apartment including extended floor area, the omission of pedestrian entrance from Kilskyre road and minor variations to north and east elevations at ground floor level, revised internal layouts and provision of private open space (D) Block A Unit 1 commercial unit. Omit basement access stairs and extend floor area to 102 sq.m
(A) Demolition of existing public house and petrol station,(B) Mixed Use Town Centre Development comprising of a three storey block of 5 No. apartments and 1 No. 51 sq.m commercial unit. Block of 6 No. three storey 3 bedroom terraced town houses, block of 5 No. two storey 2 bedroom terraced town houses, private and shared open space comprising of landscaped inner courtyard as residential amenity space, (C) 2 No. two storey 3 bedroom semi-detached on previously granted site( Planning Ref: 02/850) (D) Detached single storey block with a 65 sq.m adaptable community/pre-school infant and child-minding facility, (E) One-way street to north and west boundaries with shared vehicular/cycle pedestrian access, private linear street parking to serve the residents of the proposed development. (F) New public street enhancement with street parking bays, new footpaths and pedestrian crossing link to the main street, seating, new tree planting and public lighting (G) Ancillary shelter structure to accommodate waste collection and recycling, bicycle storage and maintenance equipment storage to serve the management of the proposed residential amenities and services. (H) Connection to existing water, waste and surface watermain drainage on the site.
Extension of Duration for (A) Demolition of existing public house and petrol station,(B) Mixed Use Town Centre Development comprising of a three storey block of 5 No. apartments and 1 No. 51 sq.m commercial unit. Block of 6 No. three storey 3 bedroom terraced town houses, block of 5 No. two storey 2 bedroom terraced town houses, private and shared open space comprising of landscaped inner courtyard as residential amenity space, (C) 2 No. two storey 3 bedroom semi-detached on previously granted site( Planning Ref: 02/850) (D) Detached single storey block with a 65 sq.m adaptable community/pre-school infant and child-minding facility, (E) One-way street to north and west boundaries with shared vehicular/cycle pedestrian access, private linear street parking to serve the residents of the proposed development. (F) New public street enhancement with street parking bays, new footpaths and pedestrian crossing link to the main street, seating, new tree planting and public lighting (G) Ancillary shelter structure to accommodate waste collection and recycling, bicycle storage and maintenance equipment storage to serve the management of the proposed residential amenities and services. (H) Connection to existing water, waste and surface watermain drainage on the site.
Development consisting of the following: (1) To construct 3 no. detached one and a half storied type dwelling houses. (2) To connect to public mains water and sewage services. (3) To provide new front boundary walls, gates and piers with individual entrances to the houses. (4) All associated and ancillary site works
To construct a part single, part two storied extension to the rear and side of the existing two storied dwelling. Works to the existing dwelling which will include alterations to the existing window and door openings, removal of the existing chimneys and the fitting of roof lights to the existing roof and internal alterations to the layout. To demolish an existing detached domestic garage and all ancillary site development works
The brief summarizes the pattern across all 182 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 196128The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief