Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 673 decisions within 5 km, 2 exact-site or onsite candidate records, and 38 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
38 structured nearby appeal records.
38 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Modifications to previously granted development of extension to the existing Lidl Regional Distribution Centre (RDC) storage and distribution warehouse (WC Reg reg 18/6264) A total site area of 6.77 Hectares. The proposed amendment comprises modification to the permitted scheme as follows; the reduction of warehouse floor area by 2,207 sqm, as now totals 57,617 sqm, a reduced length of 39.24 m and a reduced maximum height by 3.85m, the associated repositioning of the permitted photovoltaic panels in association with same, the retention of the existing two storey administration block 1,058 sqm (previously to be demolished) and its extension by 542 sqm, the omission of the permitted proposed administration block (1,791 sqm) the omission of the permitted two-storey warehouse management building (330 sqm), the omission of the HGV driver welfare block (81 sqm), the omission and amendment of new and relocated HGV and staff car parking area to provide for total 49 no. HGV's and total 240 no. Cars, where the omission of previously permitted extended parking areas allows for a larger open space and landscaped area, reconfigured perimeter swale area and the retention of the existing HGV only access arm off the existing access roundabout. The amendments as otherwise referred relies on the previously scheme 18/6264
Extension (22,041sqm) to the existing LIDL RDC Storage & Distribution Warehouse(46,840sqm). Comprising of an extension of the existing RDC by 19,839 sqm with principal extended dimensions of 149.71m length, 132.52m width and principal height of 14.05m with a central raised roof area to maximum height of 20.85m, demolition of Unit 43(an existing wholesale warehouse at Site 43 2,623 sqm), demolition of the existing two storey administration block (1,058 sqm) its relocation to the extended element of the RDC and construction of a new two storey administration block (1,791 sqm) dimensions of 44.92m by 19.94m by max height of 10.91m, erection of a new two storey warehouse management building(330sqm) with external dimensions of 16.11m length by 10.21m width, new and relocated HGV and staff car parking areas to provide for total 92 no HGV's (43 existing and 49 additional) and total 317 no. staff cars (219 existing and 98 proposed) 30 no. covered secure cycle stands, new single storey HGV driver/staff welfare facilities block (81 sqm) maximum external dimensions 5.65m x14.55m new perimeter surface water drainage swales, 2no. attenuation ponds, new perimeter landscaping and berm landscaping, a staff picnic/open space area, supplementary planting associated with the removal of existing cultivated tree stands; associated accommodation works to allow for the diversion of existing 110kv /ESB overhead and 38kv underground power lines and relocation of existing MV substation in northern sector of site and; revised primary vehicular (HGV & car) access to the proposed development will be provided from the existing service road roundabout. The proposed development will incorporate all associated hard and soft landscaping, boundary treatment, footpaths and ancillary works above and below ground and as provides additional 1 no. sprinkler tank to existing sprinkler tank 1 No. and pumping station and roof plant to incorporate photovoltaic panels.
Modification to previously granted and amended Lidl Regional Distribution Centre (RDC) storage and distribution warehouse (WCC REG. Refs 18/6264 & 19/6330) at Lough Sheever Corporate Park, Robinstown (Levinge), Mullingar Co Westmeath. The proposed amendments application comprises modifications to the permitted and subsequent amended scheme as follows; the demolition of units 32A, B & C (539.2 sqm) and provision of a new HGV Parking Area of 56 no. spaces and associated driver welfare building (81 sqm) HGV parking provision totals 90 no. space as per previously approved 83 no, a further reduced staff and operational car park area as totals 244 no. car parking spaces 317 previously approved, further revisions and modifications to the existing administration block for a total floor area of 1,479 sqm, 1,791 sqm previously granted, revisions to roof profiles of extended warehouse as amended and permitted with total height increased by 0.8m from 15.465m to 16.265m, reconfigured surface water layout as facilities a new attenuation pond of 800 cubic meter capacity. The amendments as otherwise referred relies on the previously granted scheme 18/6264 as revised by 19/6330
Change of use of the existing warehouse section of Unit 40 into office and the construction of a first-floor office area within the structure of the existing warehouse. Permission is also sought for all the associated elevation changes in terms of new windows and doors and removal of some existing windows and roller shutter door. Permission is also required for revised car park/ yard layout, ancillary structures including bin stores, bicycle shelter and all associated site development works to complete the development.
Development consisting of an Electrical Vehicle (EV) Charging Station, site of 0.14Ha. The development will consist of 5 no. EV charging stations, 3 no. canopies incorporating approx. 17 sqm in area of solar panels per canopy, 1 no. disabled access public convenience (WC), 1 no. ESB substation, 1 no. SSE substation with new access to and egress form the site and all associated landscaping and above and below ground ancillary works
Construction of a single storey building (207.4 sqm) which includes offices, waiting room, fuel store and ancillary staff areas (2) construction of a gantry structure, bunded tank farm for housing 4 no. 55,000 litres tanks, 1 no. 65,000 litres tank, associated pipework and overground fill points (3) connection to existing foul and surface water drainage systems including installation of surface water attenuation storage tank, 10,000 litres Class 1 forecourt interceptor and 3,000 litres wash down interceptor (4) installation of 1 no. jet wash facility, truck wash slab, 1 no. fuel dispensing pump island unit and associated fuel pipework (5) signage (2.7 sqm) and main id sign (3 sqm) (6) associated site works includes boundary treatments, security access gate, landscaping and vehicle parking spaces.|
The brief summarizes the pattern across all 673 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 196330The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief