Executive snapshot
10% of nearby decided applications were refused. The site check found 679 decisions within 5 km, 3 exact-site or onsite candidate records, and 39 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
39 structured nearby appeal records.
39 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Erection of a low level boundary wall with wire mesh fencing over, erection of entrance gates, erection of metal palisade fencing to side boundary and all ancillary site works
Proposed single storey extension to the rear of the existing warehouse including associated ancillary site development works and services alterations
Permission for internal modifications to existing layouts and the construction of new first floor mezzanine extension consisting of new office, records room and archive space (51.8 sqm) and the provision 1 no. new first floor window to the northeast elevation together with all associated site works.
Development which will consist of the provision of commercial buildings arranged in 5 no. blocks. Block Z1 & Z2 comprising 3315 sq. M. of warehousing with ancillary office and wc facilities; Blocks Z4 & Z5 comprise 3683.1 sq. m. of office space over 3 and 4 no. stories; Block Z6 comprising of 377.5m² of café and office space.; an esb sub station and switch room; entry is via 2 no. access points of the corporate park service road comprising an existing entrance and new vehicular entrance. The development will provide 161 no. parking spaces, including EV charge points, and 76 no. cycle spaces; HGV set down areas; ancillary hard and soft landscaping, bin stores, signage, public lighting, entrance totem, boundary treatments and all associated site works
Construction of a single storey building (207.4 sqm) which includes offices, waiting room, fuel store and ancillary staff areas (2) construction of a gantry structure, bunded tank farm for housing 4 no. 55,000 litres tanks, 1 no. 65,000 litres tank, associated pipework and overground fill points (3) connection to existing foul and surface water drainage systems including installation of surface water attenuation storage tank, 10,000 litres Class 1 forecourt interceptor and 3,000 litres wash down interceptor (4) installation of 1 no. jet wash facility, truck wash slab, 1 no. fuel dispensing pump island unit and associated fuel pipework (5) signage (2.7 sqm) and main id sign (3 sqm) (6) associated site works includes boundary treatments, security access gate, landscaping and vehicle parking spaces.|
The development to be retained comprises of modifications to permitted site layout granted under Application Register Reference 07/5463 and all other associated site development works to include the following: (i) construction of external storage compound which adjoins existing retail building (GFA 40sqm.); (ii) an extended car parking area with additional hardstanding which incorporates 9no. car parking spaces along with the retention of 10no. additional car parking spaces within the site; (iii) the relocation of existing services area to southern corner; (iv) the relocation of existing jet wash to western boundary; (v) the relocation of vent stack and fuel filling points to northern boundary and; (vi) 2no. non-illuminated box signs which front onto public road
The brief summarizes the pattern across all 679 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 196347The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief