Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 688 decisions within 5 km, 3 exact-site or onsite candidate records, and 41 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
41 structured nearby appeal records.
41 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Demolition of rear external cladding façade, brise soleil canopy and internal fire escape stairwell of existing building, the demolition of existing boundary wall to north of site. Construction of new two storey extension (1180m2) to existing manufacturing/industrial unit to provide additional office, canteen, changing facilities, new internal fire escape stairwell to provide an overall building floor area (3375m2). Increase in site area to include additional parking and construction of new boundary wall to north of site (450m2). Ancillary site works to include revised car parking layout, diversion of underground services and associated drainage & footpath works.
For a development which will consist of proposed mezzanine level to existing manufacturing /industrial unit and associated works
Change of use of ground floor Unit C from Enterprise and Employment (506sqm.gross floor area ) to office use, revised elevations, new signage and provision of 16 car parking spaces and bicycle parking and all associated works including connecting into existing drainage.
The construction of a set of hinged gates, piers, fencing, landscaping and all associated site works to shared access roadway
Construction of 4 no. storage tanks for the purpose of storing raw materials, additional loading and unloading area, fence around proposed tanks and existing chiller and transformer units with all associated site works and services
A) An extension to existing southern elevation to allow for the expansion of the existing production area along with additional office space on ground and first floor and change of use of a section of the existing production area on ground floor to office, along with the relocation of some existing plant to accommodate the extension and all associated elevational changes. b) Change of use of the existing decommissioned oil tank storage area to the northern elevation of the main building into staff facilities along with the construction of a link structure between the main building and existing decommissioned oil tank storage area along with all associated elevational changes. c) The rendering of the existing lower section of the elevations to match the proposed extension finishes, with new cladding to the west and north elevations, with remaining existing cladding painted. d) The removal of existing water storage tank to the southern elevation and part demolition of transformer room to accommodate the proposed southern extension. e) The installation of a perimeter mesh fencing with the provision of additional parking and relocated new truck-only entrance from the existing estate road. f) ancillary site works, and all works above and below ground to accommodate the above works
The brief summarizes the pattern across all 688 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 206008The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief