Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
14% of nearby decided applications were refused. The site check found 78 decisions within 5 km, 3 exact-site or onsite candidate records, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To widen existing forestry access entrance and all associated site works to existing forestry lands
Construction of 1 No. bell mouth entrance with access road so as to facilitate access into existing forestry plantation for the removal of timber and all ancillary works
Demolition of the existing rear (northwest), lean to, extension (9.5sqm) and construction of a single storey extension (128.7sqm) to the rear (northwest) of the existing dwelling, installation of a septic tank and filter system constructed on-site and polishing filter and all associated site works. Retention permission also sought to retain the existing single storey garage (51sqm) as built on site.
Planning permission to construct a dwelling house and detached garage with treatment system and percolation area with all ancillary site works
Development which will consist/consists of: a 10-year permission for the development of a solar farm on a site of 140 hectares consisting of the following: 781,578sqm of solar photovoltaic panels on ground mounted steel frames; 17 hardstanding locations for the installation of electrical skids; new internal access tracks; underground power and communications cables and ducts, including along the L-5802, R-393, L-5913, L-1811 and the L-5808 public roads; a new access point and an upgrade to an existing access point along the R-393 public road and a new access point along the L-5808 public road; landscaping and biodiversity enhancement measures; boundary fencing; and all associated ancillary development, site works and services. The solar farm will be operational for 40 years
Demolition of an existing dwelling house and attached shed, construction of a new dwelling house, decommission existing septic tank and construct new septic tank and percolation area and all ancillary site works
The brief summarizes the pattern across all 78 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 206078The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief