Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 147 decisions within 5 km, 1 exact-site or onsite candidate record, and 10 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
10 structured nearby appeal records.
10 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To erect a new cubicle shed with 2 no. slatted tanks, new outdoor bulk milk storage tank and ancillary site works
Construction of a new two storey type dwelling house, domestic garage, new vehicular entrance, proprietary wastewater treatment system and soil polishing filter and all associated ancillary site services
Development which will consist of a new domestic garage and extended gravel accessway to rear of existing private dwelling
Permission to construct a new bungalow type dwelling house, domestic garage, new domestic vehicular entrance, wastewater treatment system and raised soil polishing filter and all ancillary site services
Retention permission is sought for the rear extension (12.8 sqm), consisting of a dining area all associated site works at the above address.
Development and construction of a logistics warehouse at the site of the former site compound for the M6 Motorway project, a site of 2.99 Hectares. The development which will consist of the construction of a logistics warehouse (956.20 sqm) with a maximum ridge height of 9.80 m for the supply and distribution of parts for large plant and machinery and two storey office within the building, covered parts storage area, associated trade counter, car parking, external loading and unloading area, and all associated site works and services including the construction of a realigned site entrance, site services and all associated site works above and below ground to accommodate the proposed works including new treatment system and percolation area
The brief summarizes the pattern across all 147 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 206135The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief