Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 167 decisions within 5 km, 1 exact-site or onsite candidate record, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To construct a new bungalow type dwelling house, domestic garage, new vehicular entrance, septic tank and percolation area and all ancillary site services
The construction of a part single-storey part 2-storey dwelling, waste water treatment system with percolation area, improvements to existing road entrance and all associated and ancillary site works
Permission for an extension to the rear and side of the existing dwelling, alterations to the existing dwelling, replacement of the existing septic tank with a proprietry effluent treatment system and percolation area and all ancillary site services
Construction of a dwelling house, detached garage with Onsite Sewerage System and percolation area with all ancillary site works
Extend existing dwelling house at the side and rear to include a master bedroom with wardrobe, bathroom and utility, hot press, kitchen, dining and living area and sun room and to demolish garage and porch and to construct a new porch and to demolish & replace shed at rear with a new shed and to decommission existing septic tank & percolation area and install an Onsite Sewerage System and percolation area with all ancillary site works
Retention for existing dwelling house and garage, amendments include the following. (1) Increase of ridge height of the roof by 1.195m (2) Increase of total floor area from 224sq m to 308.7sq m (3) Alterations to style of window to north, east & west elevations (4) Additional dormer window to east and west elevations (5) Domestic garage 127.9sq m and all at the above address (6) Upgrade existing septic tank with new septic tank and percolation area to EPA standards
The brief summarizes the pattern across all 167 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 206176The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief