Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 101 decisions within 5 km, 1 exact-site or onsite candidate record, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Retention permission and permission for development at this site as follows: (i) retention of existing 80 metre meteorological mast which was erected as exempted development in accordance with Class 20A, Schedule 2 of the planning and development regulations 2001 (as amended) and all ancillary infrastructure and associated site development and reinstatement works and (ii) the increase in height of the existing meterological mast from 80 metres to a maximum height of up to 100 metres. Existing access arrangements using agricultural access tracks, will remain unaltered. The operational lifetime of the proposed development will be up to five years.
To develop an existing entrance and upgrade it to forestry harvesting standard(bell mouth entrance) onto public road to facilitate access to factory plantation together with internal access road and all associated site works
(a) renovation & extension of existing semi-detached dwelling, (b) upgrade existing septic tank to Proprietary Waste Water Treatment System & (c) retain existing Store / Garage
Construction of a two storey dwelling, detached domestic garage & store, install a proprietary wastewater treatment system and all associated site development works.
(a) construct a single storey extension to rear of existing dwelling and (b) RETENTION PERMISSION for existing ground floor bedroom (previously a garage) & all associated site development works
Indoor Slatted Cattle Housing Unit with Underground Slurry Storage Tanks, Dry Fodder Store, Concrete Aprons and all site works
The brief summarizes the pattern across all 101 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 206221The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief