2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 198 decisions within 5 km, 2 exact-site or onsite candidate records, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The development will consist of permission for infilling of lands with material consisting of clean, uncontaminated soil and stone only. The infilling is to restore a historic sand and gravel pit. Permission is also sought for the placement of one portable toilet and one portacabin, on a temporary basis which will serve as an office for the duration of the infilling process. A temporary flooded wheel wash will also be installed onsite for the duration of infilling activities. An Article 6(3) of the Habitats Directive Screening for Appropriate Assessment report has been prepared in respect of the proposed development. Subsequent to planning a waste facility permit will be sought from Westmeath County Council for the duration of the infilling process and associated activities.
Renovation and extension to existing dwelling comprising the following: construct new ground floor extensions to the north east, south east, north west and south west of the existing bungalow together with a carport extension to the north east of the existing bungalow, a first floor extension over ground floor north east and north west extensions and partly incorporated into existing roof space, demolition of existing shed, installation of proprietary treatment system with percolation area and all associated works
Construct one number detached, storey and a half type dwelling, one number detached single storey garage, to upgrade and relocate existing entrance to public road, to install a private well, a septic tank and percolation area, and all associated site works
To construct one number detached, storey and a half type dwelling, one number detached single storey garage, to upgrade and relocate existing entrance to public road, to install a private well, a septic tank and percolation area and all associated site works
Proposed development which will consist of the following: a roofed manure pit, walled silage slab and 4 bay open slatted shed with an underground slurry storage tank along with all associated site works
Development which will consist of the following: • Continue the use of a quarry over an area of 4.939 ha to a maximum depth and reduced floor level of 80.000m. Excavation of sand and gravel will take place over an area of 4.71 Ha; • It is proposed to continue extraction activities in the authorized existing quarry as already granted by An Bord Pleanála (Ref no. 25.SU.0002), void above the water table, and to laterally extend the existing quarry void to the north/northwest; • The proposed duration of excavation is 10 years, to reflect anticipated extraction of remaining reserves and depending on market conditions and a further 3 years for restoration; • Inclusion of all site screening and landscaping works including end of operation restoration to agricultural use; • The development will consist of removal of approximately 400,000m3 of sand and gravel from the site via the public road. The excavated material will comprise sand and gravel which will be extracted by mechanical means. The extracted sand and gravel material will be transported to an onsite central plant area for washing, grading and processing as per NSAI certification; • The infill and restoration of the existing end of life quarry excavated areas with approximately 250,000m3 of clean inert soil and stone (375,000 tonnes assuming a density of 1.5) to restore the lands to agricultural uses as required under the conditions of the Substitute Consent granted in 2013 and not undertaken by the previous operator. The infill would be completed under an Article 27 of the European Communities (Waste Directive) Regulations 2011 (S.I. No 126 of 2011) or under a local authority waste facility permit under the Waste Management Act 1996-2008; •Installation of a new site entrance, access track and lockable gates; •Installation of a wheel wash, and temporary portaloo toilets (self-contained) and hard standing quarantine area with a cubic meter skip; • Reuse of existing weighbridge onsite, use of entrance, internal access, existing buildings and facilities; and • All other associated site works and ancillary activities, including site management, security fencing, internal surface water management, and road management including approaching passing bays
The brief summarizes the pattern across all 198 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 206299The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief