Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 77 decisions within 5 km, 1 exact-site or onsite candidate record, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The development which will consist of the proposed construction of a storey and half extension to the rear as accompanying drawing. The demolition of flat roof utility area to west of site on front elevation, demolition of flat roof extension to rear, demolition of existing fuel store shed and all ancillary site works
Erection of a 30m lattice tower structure on concrete base to support 9 no. telecommunications antennae together with the installation of dishes and associated fencing, cabling, compound area, ground based equipment cabinets, mini pillar and all associated site works
The construction of a maturation warehouse facility consisting of 12 no. maturation warehouses, filling hall,ancillary buildings and all ancillary site development works. Each proposed warehouse has a gross floor area of approximately 1,570m2 and a typical ridge height of approximately 11 metres. The proposed filling hall has associated water storage tank,8 no spirit storage vats,purified water treatment plant and loading dock; ancillary buildings and structures will include a single storey facilities building; single storey fork lift charging shed; single storey sprinkler pump-house; water sprinkler tank and ESB substation. Ancillary landscaping and site development works include a package sewage treatment plant and associated percolation area; sprinkler water retention pond;a surface water attenuation pond;10 no. CCTV surveillance cameras mounted on pole; berming, landscaping, perimeter fencing and gates.Access to the proposed facility will be via a new entrance from the L5344 with provision for emergency access from the R392.The proposed development relates to the provision of an establishment to which the Major Accident Directive applies. This is a 10 year permission to enable construction works
Construction of a new storey & half dwelling, entrance onto the public road, a wastewater treatment system and polishing filter, landscaping & all associated site works
Replacement of the septic tank and percolation area with a new wastewater treatment system and polishing filter within new site boundary
Construction of an extension to my existing dwelling house at the side and rear to include kitchen, dining, utility, bathroom, hall, living room and 3 bedrooms, one with an en-suite and to demolish porch and construct a new porch and to demolish three chimneys and construct a new chimney and to demolish existing shed with all ancillary site works
The brief summarizes the pattern across all 77 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 206310The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief