Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 689 decisions within 5 km, 1 exact-site or onsite candidate record, and 39 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
39 structured nearby appeal records.
39 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The development consists of 30 new car parking spaces at the perimeter of the existing carpark within the hospital campus, The development is within the curtilage of a protected structure
A) a 2-storey energy centre building; b) window, curtain wall, door and cladding replacement works; c) roof mounted solar photovoltaic panels, and all associated site development works. The development also consists of replacement of existing windows and external ductwork to protected structure RPS No 019-004.
Construction of a temporary accommodation ambulance base prefabricated building and all associated site development works. The proposed works consists of works within the curtilage of a protected structure.
The development will consist for a 1741 m2 two storey out-patients department (OPD) together with an adjacent free-standing 28m2 plant room. The OPD will consist of medical consulting rooms, admin offices, storerooms, toilets, staff facilities and ancillary accommodation. The development to include installation of PV panels to the roof of the OPD, landscaping, all necessary site works and services connections together with the provision of 2No. Totem signpost at the entrance to the hospital. The development is within the curtilage of a Protected Structure RPS No 019-004
Construction of a security porch to the existing front entrance of C.A.D.S. Unit Building. The proposed development consists of works to a protected structure.
Construction of a 616sqm ground floor extension with plant room 214sqm above, to include Magnetic Resonance Imaging (MRI) Unit and extensions to the Emergency and Radiology Departments and all ancillary works as necessary at south-west side of The Midlands Regional Hospital Mullingar and the demolition and removal of the 86sqm ambulance base building. The development is within the curtilage of a Protected Structure (Ref 019-004).
The brief summarizes the pattern across all 689 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 206313The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief