Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 247 decisions within 5 km, 5 exact-site or onsite candidate records, and 12 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
12 structured nearby appeal records.
12 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
1) Demolition of existing single storey sections to the east and south sides of the building and replacement of same with a new single storey extension to the east side of the building with additional floor space to accommodate facilities for mechanics and extended parts storeroom 2) Renovations to existing reception/office/parts area to incorporate a new ground floor layout and a first-floor canteen and storeroom including the addition of a second-storey extension to accommodate new staff offices, board room and toilet facilities 3) Renovations to the workshop area to include increasing the height of rear of the workshop to allow Heavy Goods Vehicles (HGVs) to pass through and to lengthen Bays 4 to Bay 8 4) New cladding to front and sides of the building to comply with the accompanying Renault Trucks Dealer Facility Standards and Branding 5) Installation of solar paneling and all associated site works
Retention permission for the following: 1) 105.41sqm floor area of existing commercial truck service, parts and sales area 2) 742.58sqm floor area of existing workshop space 3) Existing site signage. Planning permission for the following works: 1) Decommissioning of existing septic tank and percolation area and replacement of same with a new septic tank and percolation area 2) Close existing business site entrance and construct a new business site entrance 3) Remove existing container currently used as a canteen 4) Install a new truck wash facility, underground oil interceptor tanks, new concrete apron/hardstanding parking area and landscaping to the overall development 5) New site signage; and all associated site works at our premises
To construct an additional bay to the western end of the workshop, single storey staff offices, toilets, reception and waiting area ancillary to the use of the premises and all associated site works at our premises.
Demolition of the existing office block and construct a new 2 storey office block ancillary to the main use of Reynolds Commercials and all associated site works
Decommissioning of existing septic tank and replacement of same with a single dwelling treatment system with percolation area and all associated site works
Retention of a single-storey extension to the north and west elevation of the existing dwelling and all ancillary site works
The brief summarizes the pattern across all 247 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 207085The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief