Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 850 decisions within 5 km, 4 exact-site or onsite candidate records, and 57 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
57 structured nearby appeal records.
57 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A) Construction of an extension to the south of the existing factory to facilitate two new dock levellers B) Elevational changes to rear north-facing elevation to incorporate the installation of a new roller door C) All ancillary site works associated with the above
Permission for construction of a new ESB substation to the south of the existing factory and elevational change involving relocation of an existing door on the south elevation including all ancillary site works
Retention for a lightweight Structure enclosing 3 No Paddle courts with an entrance lobby. The development islocated and delineated within the existing Site and at the eastern end of the Planet Athlone Bowling and leisure centre, replacing existing 5 A side Astra turf and its 2M enclosing fence. The development includes site works to existing structure, including interalia: Storm water drainage disposal
The development will consist of the following: (i) Proposed change of use from a Tile Centre to a Gymnasium, Gymnasium will include an indoor Astro Turf Pitch, dressing rooms and toilet facilities (ii) alterations to selected elevations (iii) external signage (iv) and all associated internal, external and site works
(i) retention of a single storey sunroom extension to the south elevation of existing dwelling and retention of a single storey extension to the east and north elevation of existing garage and additional door and window to the west elevation and single leaf wall to south elevation and brick plinth to west elevation and all ancillary site works (ii) proposed on site surface water drainage
The development consists of the installation of 72m of floating mooring, access gangway and construction of a new access plinth and path connecting to existing path. Installation of a single 9m length unit with lower freeboard for canoes and small boats. Cleaning and small amount of dredging 65m3 of the area beside the existing quay steps to improve access for small boats and canoes. The proposal will involve works to or within the curtilage of the following protected structure Quay and Slipway (RPS 097). A Natura Impact Statement and Ecological Impact Assessment have been prepared and included as part of the planning application.
The brief summarizes the pattern across all 850 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 207203The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief