Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
15% of nearby decided applications were refused. The site check found 251 decisions within 5 km, 1 exact-site or onsite candidate record, and 364 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
364 structured nearby appeal records.
364 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
PERMISSION FOR CONSTRUCTION OF A SINGLE STOREY DWELLING HOUSE AND DOMESTIC GARAG
PERMISSION FOR ALTERATIONS TO THE APPROVED SITE BOUNDARIES AND ALL ASSOCIATED SI
Permission for the erection of a sully serviced dwelling house
Permission for retention of an extension to the side of an existing dwelling
PERMISSION FOR NEW ENTRANCE ONTO PUBLIC ROAD
PERMISSION FOR THE ERECTION OF A FULLY SERVICED DWELLING HOUSE
The brief summarizes the pattern across all 251 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20150541The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief