Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
21% of nearby decided applications were refused. The site check found 334 decisions within 5 km, 1 exact-site or onsite candidate record, and 477 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
477 structured nearby appeal records.
477 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
PERMISSION FOR RETENTION OF ALTERATIONS TO EXISTING DWELLING AS A CHANGE TO THAT
Permission to construct 1) Housing for grain dryer and accessories 2) Farm stora
Permission to erect straw shed and associated site works
Permission to erect an extension to the side of the existing grain storage
Permission for retention of an existing boundary wall surrounding existing premi
PERMISSION FOR 1. RETENTION OF AN EXISTING SHED (783.79 SQ.METERS) WHICH IS BEIN
The brief summarizes the pattern across all 334 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20171539The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief